Laserfiche WebLink
Aaron S.Y. Chung, Council Chair <br /> and Members of the County Council <br /> County of Hawai`i <br /> Page 8 <br /> construction of approximately 100,000 square feet of the proposed medical office park and <br /> approximately 100,000 square feet of the commercial center to commence within five (5) <br /> years of the ordinance. Likewise, construction of the Ponahawai Street extension was to <br /> commence within the five (5) year period and be completed within ten(10) years. In 2015, <br /> the Planning Director approved an administrative time extension for Condition L, which <br /> extended the date to commence construction of the project and the Ponahawai Street <br /> extension to June 18, 2020, and extended completion of construction of the Ponahawai <br /> Street extension to June 18, 2025. <br /> Condition P required the provision of an 80-foot wide right-of-way and construction of the <br /> Ponahawai Street extension from Komohana Street to Mohouli Street within the WPD to <br /> County dedicable standards, complete with curbs, gutters, and sidewalks. The Extension has <br /> to be completed without any regard to the actual development(and hence, impact) of the <br /> project within the WPD but by an arbitrarily fixed period. <br /> The issue with these conditions is two-fold. Relative to Condition L, short of an unforeseen <br /> resurgent demand for 100,000 square feet of commercial space and 100,000 square feet of <br /> medical office/facility for a city like Hilo, it is difficult to anticipate a demand for an <br /> aggregate of 200,000 square feet of space in such a short period of time. <br /> As such, the applicant believes that instead of arbitrarily establishing a minimum square <br /> footage to commence and complete a project, it would be more appropriate to integrate the <br /> necessary infrastructure (road, water, wastewater) requirements with what is being actually <br /> developed through the Plan Approval process. In concept, this would be no different than <br /> reviewing a development on an existing zoned property. In those situations, infrastructural <br /> requirements relative to access, water, wastewater and so forth are addressed and <br /> implemented in conjunction with the Plan Approval and building permit processes, with all <br /> necessary infrastructure completed prior to issuance of an occupancy permit. <br /> Relatedly, Condition L requires improvements to the Ponahawai Street extension and its <br /> intersection even if a project within the WPD does not utilize the area required to be <br /> improved. In that case, the applicant would be subjected to making premature infrastructure <br /> improvements,which adds significantly to the upfront cost. This cost is further compounded <br /> by Condition P, which requires an 80-foot wide right-of-way, complete with curbs, gutters, <br /> and sidewalks, a standard that may be substantially in excess of the possible impacts of a <br /> project. <br />