My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 049 Draft 01 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 049 Draft 01 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 2:54:03 PM
Creation date
3/27/2019 8:44:15 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
049
Draft
01
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
PC
Action 1
Council: Bill 49 amended to Draft 2 - 4/24/2019
Document Relationships
AGE COUNCIL 2019-04-24 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE PC 2019/04/09 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Planning Committee (PC)
COM 0198.000 2018-2020
(Original Version)
Path:
\Council Records\Communications\2018-2020
REP PC 020 2019/04/09 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uses, overall densities, open space requirements, and infrastructure requirements, and are <br /> not contrary to the amended Project District Ordinance. <br /> J. Upon approval of the revised Master Plan depicting the phasing of the overall <br /> development, [The] the applicant shall provide a revised detailed water master plan <br /> showing the water system improvements needed for each phase of the development. The <br /> plan shall meet with the approval of the Department of Water Supply and shall be <br /> submitted to the Planning Director within two (2) years from the effective date of the <br /> amended Project District Ordinance or prior to submission of plans for plan approval or <br /> residential or non-bulk lot subdivision approval, whichever occurs first. A bulk lot refers <br /> to a lot created for the purpose of enabling its subsequent development pursuant to the <br /> approved master plan. <br /> K. The applicant, successors, or assigns are responsible for maintaining valid water <br /> commitments for the 200 units of water currently available to the Wailani Project District <br /> until such time that required water facilities charges are paid in full and necessary water <br /> system improvements are constructed and conveyed to the County of Hawai`i Water <br /> Board. Before a water commitment for the development can be effected, beyond the <br /> initial water commitment of 200 units of water, the applicant shall enter into a Water <br /> Development Agreement with the Water Board, pursuant to Rule 5 of the Department of <br /> Water Supply's rules and regulations. The Agreement will establish,but not be limited <br /> to, the scope of water system improvements required to serve the development, allocation <br /> of water to the development, duration of water commitments, timeline for completion of <br /> improvements, and payment of applicable facilities charges. The applicant shall also <br /> construct all water system improvements as required by the Department of Water Supply <br /> through its standards. These improvements may include but not be limited to additional <br /> source, transmission, storage and booster pump facilities. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.