My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 049 Draft 01 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 049 Draft 01 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 2:54:03 PM
Creation date
3/27/2019 8:44:15 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
049
Draft
01
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
PC
Action 1
Council: Bill 49 amended to Draft 2 - 4/24/2019
Document Relationships
AGE COUNCIL 2019-04-24 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE PC 2019/04/09 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Planning Committee (PC)
COM 0198.000 2018-2020
(Original Version)
Path:
\Council Records\Communications\2018-2020
REP PC 020 2019/04/09 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Management may reasonably require, which the sewer study may indicate are advisable <br /> for mitigation of impacts of the development. <br /> [P-]O. [The extension of Ponahawai Street from Komohana Street to Mohouli Street(referred to <br /> hereafter as the "Ponahawai Street extension") shall be a minimum right of way width of <br /> •e -- - - <br /> gutters, and sidewalks, and be built on an alignment meeting with the approval of the <br /> Department of Public Works in consultation with the Planning Director. Upon its <br /> completion, the roadway shall be dedicated, at no cost, to the County.] Based on an <br /> alignment meeting with the approval of the Department of Public Works in consultation <br /> with the Planning Director, the applicant, its successors or assigns shall provide and <br /> dedicate to the County a minimum right-of—way width of eighty(80) feet for the <br /> extension of Ponahawai Street from Komohana Street to Mohouli Street (referred to <br /> hereafter as the "Ponahawai Street extension"). Said right-of-way shall be dedicated at no <br /> cost to the County no later than completion of improvements within that portion of the <br /> right-of-way, or earlier without improvements, upon request by the County. <br /> P. The Ponahawai Street extension and related intersection improvements shall be <br /> constructed by the applicant, successors, or assigns in two stages. Construction of the first <br /> stage shall commence within five (5) years of the effective date of the amended Project <br /> District Ordinance, and shall be completed within ten (10) years of the effective date of <br /> the amended Project District Ordinance. Completion of construction may be assured by a <br /> sufficient surety bond, meeting with the approval of the County of Hawai`i. Construction <br /> of the first stage shall include constructing the entire length of the Ponahawai Street <br /> extension with paved shoulders and paved swales for the entire width of eighty(80) feet, <br /> meeting with the approval of the Department of Public Works. Construction on the <br /> second stage shall include constructing the entire length of the Ponahawai Street <br /> extension with concrete curbs, gutters, sidewalks and drainage improvements, as required <br /> by the Department of Public Works. The second stage improvements shall be completed <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.