Laserfiche WebLink
along with any necessary pavement transitions[.-] , unless otherwise approved by <br /> the Department of Public Works. The applicant shall construct the additional <br /> improved street right-of-way at no cost to the County, prior to receipt of a <br /> Certificate of Occupancy. <br /> F. Access to Hualalai Road shall be limited to one approach, located as approved by <br /> the Department of Public Works. An additional gated access should be provided <br /> at the mauka end of the property to the existing County flood control access road <br /> for emergency access purposes and be gated. The applicant shall provide a left <br /> turn storage lane on Hualalai Road to the subject property prior to the issuance of <br /> a Certificate of Occupancy[.-] ,unless otherwise approved by the Department of <br /> Public Works. All sight distances to the approach roach shall meet the requirements of <br /> g <br /> the Hawai`i Statewide Uniform Design Manual (AASHTO). <br /> G. Any utility poles in the road right-of-way shall be installed as shown on DPW <br /> Standard Detail R-35 (Revised). The applicant shall provide any necessary <br /> easements for installation of such utilities. <br /> H. Any vehicular security gate shall be located a minimum of 60 feet(exclusive of <br /> gate swing) from the proposed Hualalai Road right-of-way with a turnaround on <br /> the County road side of the gate. This 60-foot requirement shall not apply to the <br /> emergency access. <br /> All development generated runoff shall be disposed of on-site and shall not be <br /> directed toward any adjacent properties. <br /> J. A drainage study shall be prepared by a licensed civil engineer and submitted to <br /> the Department of Public Works. The recommended drainage system shall be <br /> constructed, meeting with the approval of the Department of Public Works,prior <br /> to the issuance of a Certificate of Occupancy. <br /> -8- <br />