My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2019-058 2018-2020
ClerkCouncil
>
Council Records
>
Ordinances
>
2019
>
ORD 2019-058 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:08:49 AM
Creation date
5/24/2019 8:52:02 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2018-2020
Year
2019
Ordinance
058
Effective Date
5/21/2019
Document Relationships
BIL 049 Draft 02 2018-2020
(Related)
Path:
\Council Records\Bills\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[S. Only emergency vehicular access from the site to the existing side streets to the north(e.g <br /> Wiliwili Street, Malanai Street) shall be allowed. In that event, the applicant shall <br /> provide removable barriers (e.g. concrete posts) on these roadways at the property line to <br /> emergency vehicular access. Should the immediately affected existing <br /> vehicular access between the site and any existing side street to the north, the Planning <br /> D• - - • - • '- - • - -- ' .. --- - - , • - .- •.. .._- - <br /> affected neighbors, may lift this restriction.] <br /> [T ]S. Streetlights and traffic control devices, as may be required by the Traffic Division, <br /> Department of Public Works, shall be designed, purchased and installed by the applicant. <br /> [U-]T. Updated Traffic Impact Analysis Report(s) (TIAR) certified by a licensed engineer shall <br /> be submitted to the Planning Director for review and approval prior to receipt of Final <br /> Plan Approval for each phase of the development or Preliminary Subdivision Approval <br /> for each phase of the residential development and not bulk lot subdivision. All additional <br /> mitigation measures, including intersection and/or roadway improvements, called for in <br /> the updated TIAR shall be implemented prior to receipt of a Certificate of Occupancy or <br /> Final Subdivision Approval, as the case may be. In the case of the Final Subdivision <br /> Approval, completion of construction may be assured by a sufficient surety bond meeting <br /> with the approval of the County. <br /> [V-]U. Because of potential roadway noise, there shall be a minimum 70-foot setback from the <br /> Komohana Street right-of-way, and a 90-foot setback from the Mohouli Street right-of- <br /> way, for any residential structure. <br /> [W-]V.All development-generated runoff shall be disposed of on-site and shall not be directed <br /> toward any adjacent properties. A drainage study shall be prepared by a licensed civil <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.