My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2019-058 2018-2020
ClerkCouncil
>
Council Records
>
Ordinances
>
2019
>
ORD 2019-058 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:08:49 AM
Creation date
5/24/2019 8:52:02 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2018-2020
Year
2019
Ordinance
058
Effective Date
5/21/2019
Document Relationships
BIL 049 Draft 02 2018-2020
(Related)
Path:
\Council Records\Bills\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. The uses disclosed in the application, as listed below, and those required as conditions to <br /> this Ordinance will be allowed in the Wailani Project District. The provision of other <br /> uses not listed will require an amendment to this Project District Ordinance. <br /> 1. All uses allowed as a matter of right in the RS, RM, and CN zoned districts. <br /> 2. All uses allowed as a matter of right in the CV zoned district, except for hotels, <br /> manufacturing, warehousing, and light-industrial uses. <br /> 3. Open space and recreational uses, including ball fields, linear parks, pedestrian <br /> paths and bikeways. <br /> 4. Infrastructure improvements. <br /> A revised detailed Master Plan of the Project District, [• -• - •- .:- -- . •: - . -: <br /> number of residential lots and units, commercial uses, open space and recreational areas, <br /> •-- : : • - --- - :- -- -. 22. " ,] shall be submitted to the Planning Director within two (2) <br /> years from the effective date of the amended Project District Ordinance or prior to <br /> submission of plans for plan approval or subdivision approval, whichever occurs first. <br /> The revised Master Plan shall describe and depict the phasing of the overall development, <br /> the location and number of residential lots and units, commercial uses, open space and <br /> recreational areas, pedestrian pathways and bikeways, landscaping, roadways, parking, <br /> and other related improvements on the property. The Planning Director may approve <br /> changes made by the applicant to the Master Plan to accommodate evolving land use <br /> concepts, topographical/physical conditions, cost, and related matters to assure the <br /> orderly and timely implementation of the Project District, so long as the changes are not <br /> significant as determined by the Planning Director and do not change the permitted land <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.