My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2019-088 2018-2020
ClerkCouncil
>
Council Records
>
Ordinances
>
2019
>
ORD 2019-088 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 10:34:34 AM
Creation date
8/9/2019 10:32:51 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2018-2020
Year
2019
Ordinance
088
Effective Date
8/8/2019
Document Relationships
BIL 081 Draft 01 2018-2020
(Related)
Path:
\Council Records\Bills\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required, shall be constructed meeting with the approval of the Department of <br /> Public Works prior to the issuance of a construction permit for any new structure <br /> or driveway. <br /> L. All earthwork and grading activity shall conform to the Hawai`i County Code <br /> Chapter 10, Erosion and Sedimentation Control, and Chapter 27, Flood Control. <br /> M. Any new construction within the Kihalani Homestead Road right-of-way shall <br /> conform to Hawai`i County Code Chapter 22, County Streets. <br /> N. In the unlikely event that any surface or subsurface historic properties and/or <br /> resources, such as lava tube openings, concentrations of artifacts, structural <br /> remains or human skeletal remains are found during construction activities, the <br /> applicants shall cease work in the immediate vicinity of the find, protect the find <br /> from additional disturbance and immediately contact the State Historic <br /> Preservation Division (DLNR-SHPD) at (808) 933-7651 for further guidance. <br /> The applicants shall also notify the Planning Department immediately after <br /> contacting the DLNR-SHPD. Subsequent work shall proceed upon an <br /> archaeological clearance from DLNR-SHPD when it finds that sufficient <br /> mitigation measures have been taken. <br /> 0. An initial extension of time for the performance of conditions within the <br /> ordinance may be granted by the Planning Director upon the following <br /> circumstances: <br /> 1. The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicants, successors or assigns, <br /> and that are not the result of their fault or negligence. <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.