My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0467.000 2018-2020
ClerkCouncil
>
Council Records
>
Communications
>
2018-2020
>
COM 0467.000 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 1:16:19 PM
Creation date
8/30/2019 1:45:32 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2018-2020
Communication
0467
Point
000
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Document Relationships
AGE COUNCIL 2019-10-02 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE COUNCIL 2019-10-16 2018-2020
(Related To)
Path:
\Council Records\Agendas\2018-2020\Council
AGE FC 2019/09/17 2018-2020
(Related)
Path:
\Council Records\Agendas\2018-2020\Finance Committee (FC)
BIL 095 Draft 01 2018-2020
(Related To)
Path:
\Council Records\Bills\2018-2020
REP FC 054 2019/09/17 2018-2020
(Related)
Path:
\Council Records\Reports\2018-2020\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form#: B-52 <br /> 7/18/91 <br /> DEPARTMENT OF FINANCE <br /> REQUEST FOR COUNCIL ACTION <br /> DEPARTMENT: Public Works DATE: 8/27/2019 <br /> STAFF CONTACT: Cres Rambayon PHONE: (808) 961-8926 <br /> A. REQUEST: <br /> Amend CIP Budget Ordinance 19-74 to add the following project: <br /> Waimaauau Stream bridge Repair(Bridge No. 28-1) - County $1,300,000.00 <br /> B. BACKGROUND AND JUSTIFICATION (USE ADDITIONAL SHEETS AS NEEDED): <br /> The Waimaauau Stream Bridge (Bridge No. 28-1) is an old bridge built in the 1930s with reinforced concrete <br /> slab overlayed with gravel and topped with asphaltic concrete (a.c.) pavement. The structure's concrete deck <br /> and reinforcing steel have deteriorated to the point where it needs to be replaced. <br /> The proposed bridge repair connsist of replacing the deteriorating concrete deck as well as the concrete <br /> bridge railings. <br /> SIGNED: DATE: <br /> Department Head <br />
The URL can be used to link to this page
Your browser does not support the video tag.