Laserfiche WebLink
Aaron S.Y. Chung, Council Chair <br /> and Members of the County Council <br /> Page 4 <br /> approval of the Department of Public Works. Furthermore, DPW requires that all driveway <br /> connections and construction within the Lanihuli Street Right-of-Way shall conform to <br /> Chapter 22,County Streets,of the Hawai`i County Code.Access to Lanihuli Street,including <br /> the provision of adequate sight distances, shall meet with the approval of the Department of <br /> Public Works, Engineering Division. Finally, DPW recommends that the applicant install <br /> streetlights and traffic control devices as may be required by the Traffic Division,Department <br /> of Public Works. The applicant shall be responsible for the design,purchase, and installation <br /> of such devices. The preceding will be added as conditions of approval. <br /> The proposed warehouse and food stalls are anticipated to generate approximately 32 <br /> trips entering and 15 trips exiting in the AM peak hour and 21 trips entering and 29 trips <br /> exiting in the PM peak hour. The applicant conducted a Traffic Assessment Report (TAR) <br /> dated October 10, 2019, prepared by SSFM International. The TAR concluded that traffic <br /> from the proposed warehouse/restaurant space is not expected to be significant. The total <br /> peak hour trips are expected to be at or below 50 trips (in and out) during the highest peak <br /> hour. Additionally, the proposed driveway should be designed with appropriate horizontal <br /> and vertical alignments, and adequate drainage. Finally, the TAR recommended a minimum <br /> five (5)-foot wide sidewalk should be included along the front of the property to encourage <br /> walking trips instead of vehicle trips. Conditions of approval will require the development <br /> of the driveway and sidewalks to meet DPW standards. Finally, as the proposed change of <br /> zone does not require the applicant to develop the currently proposed commercial <br /> development, a condition of approval will require a Traffic Impact Analysis Report(TIAR) <br /> should the applicant develop a use that generates over 50 peak hour trips. <br /> The project site has no severe geological or topographical problems which cannot be <br /> properly rectified, or which would render the land unusable. The property is located in <br /> flood zone "X" which is an area determined by FEMA to be an area of minimal flood <br /> hazard, which is typically outside the 500-year flood plain. According to the Department of <br /> Public Works —Engineering Division, all development-generated runoff shall be disposed of <br /> on site and not directed toward any adjacent properties. A drainage study shall be prepared <br /> by a licensed civil engineer and submitted to the Department of Public Works prior to the <br /> issuance of a construction permit. Any recommended drainage improvements, if required, <br /> shall be constructed meeting with the approval of the Department of Public Works prior to <br /> the construction of any proposed structures on the property. The preceding will be added as <br /> conditions of approval. <br />