My WebLink
|
Help
|
About
|
Sign Out
Home
Chapter 21 Sewers
PublicDocuments
>
County Clerk - Council
>
County Clerk
>
County Code
>
Chapter 21 Sewers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2019 7:43:16 AM
Creation date
7/18/2019 4:47:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEWERS § 21-11 <br />Article 3. Sewage Works and Connections. <br />Division 1. General Provisions. <br />Section 21-11. Disposal of sewage into natural outlet; treatment and <br />disposal plan required. <br />Where sewage is to be discharged into any natural outlet, primary or complete <br />treatment facilities shall be provided in accordance with regulations and requirements <br />of the State department of health. The type, capacity and location of the treatment <br />plant shall be approved by the director. <br />(1983 CC, c 21, art 3, sec 21-11; am 2002, ord 02-66, sec 4.) <br />Section 21-12. Pumping stations. <br />Pumping stations shall be provided where the terrain of the developable area is <br />such as to require pumping to lift the sewage to proper elevation for discharge to a <br />treatment plant site, public sewer or discharge outfall. These stations shall be of <br />adequate capacity and shall include the necessary physical units for proper operation, <br />control and maintenance. Suitable locations of these stations shall be approved by the <br />director. <br />(1983 CC, c 21, art 3, sec 21-12; am 2002, ord 02-66, sec 4.) <br />Section 21-13. Sewer mains. <br />Sewer mains shall be of length, type and size necessary to provide the area with <br />adequate sewage disposal and so located as not to be contrary to the location fixed for <br />utilities by the County master plan. <br />(1983 CC, c 21, art 3, sec 21-13.) <br />Section 21-14. Laterals. <br />A lateral shall be installed to provide service to each lot in accordance with section <br />21-22. When a lateral is required by the County in order for the landowner to receive <br />the final inspection approval, the County shall construct the lateral within six months <br />from the date of the requirement. <br />(1983 CC, c 21, art 3, sec 21-14; am 2004, ord 04-53, sec 2.) <br />Section 21-15. Construction standards. <br />All sewage works construction shall be performed in accordance with the latest <br />edition of the standard specifications for public works construction and the standard <br />details for public works construction. <br />(1983 CC, c 21, art 3, sec 21-15.) <br />21-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.