Laserfiche WebLink
• ROOF REPAIRS: The roofs for all remaining existing structures should be repaired. The repairs <br /> include complete removal of all existing roof finishes, including the flashings. The roof decks <br /> should be inspected for water or termite damage and repaired. A completely new roofing <br /> system with flashing of all penetrations and edges, along with gutters and downspouts should <br /> be installed. <br /> • IMPROVEMENT OF LIGHTING: Improve lighting in all common areas so that they are properly <br /> illuminated. Install emergency lighting in all common areas. <br /> • EXIT SIGNS: Install properly illuminated exit signs with directional arrows. <br /> • COORDINATION WITH THE COUNTY: Confirm with the County that the non-conforming <br /> parking lot will be grandfathered in and that the proposed improvements will not trigger new <br /> parking requirements. Or, identify existing and/or new off-site parking areas that can support <br /> the redevelopment and satisfy the County's parking requirements. <br /> • DEMOLISH THE WEST WING, LOBBY AND RESTAURANT: Demolish the West Wing of the <br /> hotel, the Lobby and shuttered restaurant. The Lobby should be demolished to allow for access <br /> to the West Wing work. Remove all large trees with invasive roots. <br /> • NEW WEST WING: Construct a new four-story West Wing of the hotel in the same location as <br /> the existing West Wing. The new West Wing should be constructed to comply with accessibility <br /> requirements. The West Wing will house modern hotel rooms, properly enclosed and 1-hour fire <br /> rated stair towers, fire sprinklers and support spaces. <br /> • NEW LOBBY, RESTAURANT and KITCHEN: After the new West Wing is completed, a new <br /> accessible and code compliant Lobby should be constructed in the same place as the existing. <br /> The Lobby would be designed so that it was constructed in the spirit of the original Lobby. The <br /> Lobby would contain 2 or 3 new elevators and elevator lobbies. The elevators would provide an <br /> accessible path from the Lobby to each of the floor levels in all three wings of the hotel. A new <br /> protected Laundry room, properly separated from the hotel wings and lobby would also be <br /> constructed. The reception area would be opened to the lobby and be accessible. An <br /> accessible route leading down toward the existing swimming pool would be constructed. The <br /> new lobby would also include a covered drop off area, luggage holding area, lobby seating <br /> areas, male and female restrooms, hotel office(s); hotel facilities support space(s), electrical <br /> and communications closets and storage. <br /> • NORTH WING HSW REPAIRS: Replace, or if possible, repair the makai end stair tower so that <br /> it is protected by not less than 1-hour rated construction. Replace all stair tower doors and door <br /> frames so that they are 45 minute rated minimum and properly labeled. All door hardware <br /> should be replaced. Doors should latch properly and meet clearance requirements after <br /> installation. Approach, entry and exit at doors should be assessed, and where structurally <br /> practicable, be improved to address accessibility maneuvering clearances. Proper signage, <br /> lighting and building emergency exit diagrams should be installed inside the stair tower. <br /> Accessible signage should be installed at each floor level, both inside and outside of the stair <br /> tower. Any penetrations into the stair tower should be removed, encapsulated or fire stopped so <br /> that the 1-hour rating is not compromised. Address exit discharge so that it's along an <br /> accessible route. Construct a new accessible and code compliant mauka end stair tower that <br /> connects the new Lobby to each floor level of the hotel. The new mauka stair tower could <br /> potentially serve both the North Wing and East Wing. <br /> • NORTH WING WINDOWS: Install guardrails at all common area windows where needed. <br /> • NORTH WING EXISTING ELEVATOR: Demolish the existing elevator and address the dead <br /> end corridor condition. <br /> • EAST WING HSW REPAIRS: Replace, or if possible, repair the makai end stair tower so that it <br /> is protected by not less than 1-hour rated construction. Replace all stair tower doors and door <br /> frames so that they are 45 minute rated minimum and properly labeled. All door hardware <br /> should be replaced. Doors should latch properly and meet clearance requirements after <br /> installation. Approach, entry and exit at doors should be assessed, and where structurally <br /> practicable, be improved to address accessibility maneuvering clearances. Proper signage, <br /> lighting and building emergency exit diagrams should be installed inside the stair tower. <br /> Accessible signage should be installed at each floor level, both inside and outside of the stair <br /> EXHIBIT D <br />