My WebLink
|
Help
|
About
|
Sign Out
Home
2020-01-22 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-01-22 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 10:00:51 AM
Creation date
1/15/2020 10:00:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Program Manager – CMS Manager (Hilo) <br />• Asset Management Specialist (Hilo) <br />• GIS Analyst I (Hilo) <br />• Program Manager (Reuse Spec I) (Kona) <br />• WW Plant Maintenance Mechanic (Kona) <br />• WWTPO IV (Kona) <br />• WWTPO IV (Kona) <br />• Plant Electrician/Electronics Repairer (Kona) <br /> <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br /> <br />A. NĀ‘ĀLEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final land selection is still in progress. <br />• The next public meeting will be scheduled to occur after the draft EA is <br />published. <br />• The state EA process required prior to purchase of land for the treatment/ <br />disposal facility and project construction is under way. Pre-consultation is <br />complete. Initial archaeological, flora and fauna checks and investigation of <br />feasibility of producing R-1 water for agricultural (stock) use and WWTP <br />processes are in progress. Revised AOC anticipated completion of the final EA <br />is not later than 07/23/21. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur once <br />the treatment and disposal system has been constructed and properties <br />connected to the LCCs have been connected to it. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies. <br /> <br />B. PĀHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Responses to comments on the draft EA continue to progress. The Final EA <br />completion is pending completion of responses to comments and Section 106 <br />consultation. Crossover of comments/responses between the county and EPA <br />is under way. Final EA/FONSI is expected to be published with OEQC in late <br />February/early March 2020. <br />• As a result of EPA funding for this project, the NEPA process in addition to the <br />State EA process is required. Both processes are to be completed prior to <br />selection of land for the treatment/disposal facility. <br />• Closure of the large capacity cesspools as mandated by the EPA will occur once <br />the treatment and disposal system has been constructed and properties have <br />been connected to the new collection system. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and partially by a federal EPA grant. <br /> <br />10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.