straying away from that because that's really not the way to do it; that's more contract zoning or
<br /> spot zoning or, yeah, it's not, it's more like a permit almost.
<br /> The other thing that I've seen in the past is that if—and, again, this is what happens when you
<br /> look at zoning from a project standpoint—is they'll put in conditions specific to a project.
<br /> They'll say if the applicant proposes a use other than what was originally proposed, they may
<br /> have to do this —a traffic study and do the improvements on a traffic study and stuff. But, again,
<br /> we want to look at it as the highest and best use in the zoning. If that is going to require curb,
<br /> gutter, sidewalk, a left turn, signalization, so be it. Then, it's taken care of. That's part of the
<br /> approval for the ordinance.
<br /> So, anyway, that was one of the, one of the options was once the zoning is in place, there
<br /> shouldn't be time conditions. That was the consideration, because whenever it gets built, it gets
<br /> built. People think, oh, the longer you delay, the more it's going to affect everybody else. And
<br /> logically—I'm trying to figure that out—but the reality is if they were to build something today,
<br /> for a developer, the cost would be far less than if they waited ten years and built it then. The
<br /> costs for development are going to be much greater. Not only that, the requirements on some of
<br /> the ordinances would be much more expensive. The infrastructure costs, if there's a fair share
<br /> condition associated with it, every year, once it passes, through years that goes up yearly, so their
<br /> costs for the fair share go up significantly. I've seen it as much as go up a third from people
<br /> waiting to develop, you know, and there comes a point that they come back to the Commission
<br /> and we bring it up to that higher level at that point. And, they're like wow, I wasn't expecting
<br /> that, you know, it's like well, that's what happens when projects get delayed.
<br /> The other discussion was considering utilizing phasing for larger projects. We have to keep in
<br /> mind, and I've spoken to a couple people on this, it's not a one shoe fits all kind of thing. Each
<br /> project is different, or each, you know,there are projects that come in that involve hundreds of
<br /> acres, and then there are projects that come in that involved 20,000 square feet. So, when we
<br /> place the same conditions on a project that's quite large versus a project that's small, we've got
<br /> to keep in mind that there has to be some sort of relevancy as far as, okay, this guy is going to
<br /> take some time here, he can't do this in five years, he's probably just going to get his permits in
<br /> five years, right? This guy here, he may be able to get off the ground and get this done in five
<br /> years. But, so the idea of phasing is, was recommended that as we consider conditions in these
<br /> permits —because a lot of this may not require any kind of code change or rule change; it's, a lot
<br /> of this is going to be dependent upon conditions placed in these ordinances. And, again, it
<br /> sometimes comes down to these projects and how big they are and what sort of time we think is
<br /> considerable for a project like this. Even with the so-called possible delays that could happen—
<br /> economic or health or whatever conditions arise that cause delays.
<br /> The other consideration was currently what happens is in the ordinances and permits is there's an
<br /> administrative time condition. It's usually a standard condition for the first original ordinance or
<br /> permit. So, it says the applicant shall construct this within five years, and then at the end of the
<br /> ordinance or permit, there is an allowance that if these certain things happen, if the applicant
<br /> wasn't able to meet that time condition, they have the opportunity to get one administrative time
<br /> extension for that timing condition. And, it's not to exceed what was originally permitted; so, if
<br /> it was five years, they could be granted an additional five years. The Planning Director has been