Laserfiche WebLink
straying away from that because that's really not the way to do it; that's more contract zoning or <br /> spot zoning or, yeah, it's not, it's more like a permit almost. <br /> The other thing that I've seen in the past is that if—and, again, this is what happens when you <br /> look at zoning from a project standpoint—is they'll put in conditions specific to a project. <br /> They'll say if the applicant proposes a use other than what was originally proposed, they may <br /> have to do this —a traffic study and do the improvements on a traffic study and stuff. But, again, <br /> we want to look at it as the highest and best use in the zoning. If that is going to require curb, <br /> gutter, sidewalk, a left turn, signalization, so be it. Then, it's taken care of. That's part of the <br /> approval for the ordinance. <br /> So, anyway, that was one of the, one of the options was once the zoning is in place, there <br /> shouldn't be time conditions. That was the consideration, because whenever it gets built, it gets <br /> built. People think, oh, the longer you delay, the more it's going to affect everybody else. And <br /> logically—I'm trying to figure that out—but the reality is if they were to build something today, <br /> for a developer, the cost would be far less than if they waited ten years and built it then. The <br /> costs for development are going to be much greater. Not only that, the requirements on some of <br /> the ordinances would be much more expensive. The infrastructure costs, if there's a fair share <br /> condition associated with it, every year, once it passes, through years that goes up yearly, so their <br /> costs for the fair share go up significantly. I've seen it as much as go up a third from people <br /> waiting to develop, you know, and there comes a point that they come back to the Commission <br /> and we bring it up to that higher level at that point. And, they're like wow, I wasn't expecting <br /> that, you know, it's like well, that's what happens when projects get delayed. <br /> The other discussion was considering utilizing phasing for larger projects. We have to keep in <br /> mind, and I've spoken to a couple people on this, it's not a one shoe fits all kind of thing. Each <br /> project is different, or each, you know,there are projects that come in that involve hundreds of <br /> acres, and then there are projects that come in that involved 20,000 square feet. So, when we <br /> place the same conditions on a project that's quite large versus a project that's small, we've got <br /> to keep in mind that there has to be some sort of relevancy as far as, okay, this guy is going to <br /> take some time here, he can't do this in five years, he's probably just going to get his permits in <br /> five years, right? This guy here, he may be able to get off the ground and get this done in five <br /> years. But, so the idea of phasing is, was recommended that as we consider conditions in these <br /> permits —because a lot of this may not require any kind of code change or rule change; it's, a lot <br /> of this is going to be dependent upon conditions placed in these ordinances. And, again, it <br /> sometimes comes down to these projects and how big they are and what sort of time we think is <br /> considerable for a project like this. Even with the so-called possible delays that could happen— <br /> economic or health or whatever conditions arise that cause delays. <br /> The other consideration was currently what happens is in the ordinances and permits is there's an <br /> administrative time condition. It's usually a standard condition for the first original ordinance or <br /> permit. So, it says the applicant shall construct this within five years, and then at the end of the <br /> ordinance or permit, there is an allowance that if these certain things happen, if the applicant <br /> wasn't able to meet that time condition, they have the opportunity to get one administrative time <br /> extension for that timing condition. And, it's not to exceed what was originally permitted; so, if <br /> it was five years, they could be granted an additional five years. The Planning Director has been <br /> 4 <br /> EXHIBIT C <br />