My WebLink
|
Help
|
About
|
Sign Out
Home
Survey
PublicDocuments
>
Civil Defense
>
Multi-Hazard Mitigation Plan 2020
>
Working Group Meetings
>
2-18-2020
>
Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2020 8:20:37 AM
Creation date
2/18/2020 8:20:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Goal #1 Goal #2 Goal #3 Goal #4 Goal #5 Goal #6 Goal #7 <br />0-37. Improve the <br />quality and effectiveness <br />of local hazard mitigation <br />planning through <br />effective training and <br />guidance that <br />strengthens linkages N N N N N <br />between the local hazard <br />mitigation plan, general <br />plan safety elements, <br />and other plans that can <br />support or enahance <br />mitigation efforts. <br />0-38. Continually build <br />linkages among hazard <br />mitigation, disaster <br />preparedness, and L....... <br />recovery programs <br />within the public and <br />private sectors. <br />0-39. Strengthen local <br />building code <br />enforcement. <br />0-40. Retrofit, purchase, <br />or relocate structures in <br />high hazard areas, <br />especially those known <br />to be repetitively <br />damaged. <br />0-41. Use mandatory <br />local general plan, <br />zoning, and subdivision <br />requirements to help N N N N N <br />establish resilient and <br />sustainable <br />communities. <br />0-42. Incorporate risk <br />reduction considerations <br />in new and updated <br />infrastructure and <br />development plans to <br />reduce the impacts of <br />natural hazards. <br />0-43. Consider risk <br />reduction in long-term N N N N N <br />planning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.