Laserfiche WebLink
DPW/LRB <br /> CONSTRUCTION CODE - DRAFT 5/26/20 <br /> For review and comment <br /> (2) Construction drawings for pre-approved model home designs, with the exception of <br /> the plot plan and/or cover sheet will not be required to be individually stamped by a <br /> person who is licensed in the State of Hawaii as an architect or professional engineer <br /> in accordance with this chapter and chapter 464, Hawaii Revised Statutes. The plot <br /> plan and/or cover sheet shall bear the same architect or professional engineer's wet <br /> seal or signature as submitted on the pre-approved model home design,pursuant to <br /> subsection (c)(1). <br /> (3) After the requisite approvals from other departments or agencies have been obtained, <br /> the authority having jurisdiction will either approve the application or inform the <br /> applicant of deficiencies in the application within six working days after the authority <br /> having jurisdiction receives notice that all approvals have been obtained. <br /> (4) Once approved, the authority having jurisdiction shall issue the permit in accordance <br /> with section 5-5-1. <br /> Article 5. Permits. <br /> Section 5-5-1. Issuance. <br /> (a) Permits shall be issued in such form and detail as shall be prescribed by the authority <br /> having jurisdiction. They shall specify the geographical location of the premises whereon <br /> the work authorized thereby is to be done; be valid only for the location so specified; and <br /> be endorsed in writing or stamped on all sets of plans and specifications "REVIEWED." <br /> {5-28(b), 9-36.) <br /> (b) Once a permit is issued,plans and specifications shall not be changed, modified, or altered <br /> without authorization from the authority having jurisdiction, and all work shall be done in <br /> accordance with the approved plans. {5-28(b).) <br /> (c) The authority having jurisdiction may issue a permit for the construction of part of the <br /> building or structure before complete plans and specifications for the whole building or <br /> structure have been submitted or approved,provided adequate information and detailed <br /> statements have been submitted that are sufficient to indicate compliance with all pertinent <br /> requirements of the construction code. The holder of such permit shall proceed at the <br /> holder's own risk, without assurance that the permit for the entire building or structure will <br /> be granted. {5-28(c).) <br /> (d) The issuance of a permit shall not prevent the authority having jurisdiction from thereafter: <br /> (1) Requiring the correction of errors in the plans and specifications; <br /> (2) Revoking or suspending any permit when issued in error, on the basis of incorrect <br /> information supplied, or in violation of the construction code, any permit or variance <br /> issued pursuant to the construction code, or other applicable law; <br /> (3) Halting building operations when in violation of the construction code, any permit or <br /> variance issued pursuant to the construction code, or other applicable law; <br /> 25 <br />