My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND (REZ 09-101)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-07-02 Windward
>
Item #2 Dr. Brian Sugai (Amend REZ 09-101)
>
PD BACKGROUND (REZ 09-101)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 11:00:48 AM
Creation date
6/22/2020 11:00:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The applicant had retained the services of appropriate design professionals, <br /> and construction plans were developed shortly after the rezoning was <br /> approved. These included plans for Plan Approval, Building Permit, and <br /> Grading Permit. However,the heavy demands of the Applicant's medical <br /> practice precluded a more focused attention to this project,resulting in having <br /> misunderstandings with the initial contractor and a subsequent lengthy <br /> litigation. <br /> Concurrently, the Applicant also had to find ways to refinance the project. <br /> This came at a time when Hawaii and the rest of the world were trying to <br /> recover from a major economic global meltdown and the financial crisis that <br /> began in 2008. This added to the difficulty in securing the timely refinancing <br /> of the project after expiration of the first 5-year construction window. <br /> Undaunted, however,the Applicant started to redesign the project with a new <br /> architect and work with a different contractor to arrive at a cost within its <br /> budget. The revised plans have been approved by the County, and its building <br /> permit is being withheld pending identification of a contractor and payment of <br /> the filing fee. This will be done immediately upon approval of the rezoning <br /> time extension. During the interim,the Applicant has authorized the <br /> contractor to do only the limited site work. <br /> It is thus self-evident that the Applicant intends to do the project and <br /> hopefully have it completed within the requested 5-year window. <br /> B. Granting of the time extension would not be contrary to the General Plan or <br /> Zoning Code. <br /> It should be noted that since the site was rezoned, there has not been any <br /> significant land use regulatory change in this area. The Hilo Community <br /> Development Plan has not been updated, and thus,the only relevant planning <br /> policy document still rests with the County General Plan. <br /> The proposed request is still not contrary to the General Plan's Land Use <br /> Pattern Allocation Guide(LUPAG)Map that defines the subject property <br /> and its immediately surrounding area for Medium Density Urban uses. The <br /> most recent revisions to the General Plan(February 2005)did not make any <br /> changes affecting the subject site. The current designation on the LUPAG <br /> map is the same as when the subject property was initially zoned CN-20. <br /> There are a number of commercially-zoned and related uses proximate to the <br /> subject site. Most notably, the proposed Wailani Project is situated west or <br /> mauka of the subject site, while the Ka Waena Lapa'au Medical complex is <br /> located at the intersection of Ponahawai Street and Komohana Street. Along <br /> Ponahawai Street and less than five hundred(500) feet away,there is a new <br /> medical office and physical therapy office. <br /> 8 <br />