My WebLink
|
Help
|
About
|
Sign Out
Home
PD BACKGROUND (REZ 09-101)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-07-02 Windward
>
Item #2 Dr. Brian Sugai (Amend REZ 09-101)
>
PD BACKGROUND (REZ 09-101)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 11:00:48 AM
Creation date
6/22/2020 11:00:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
to reduce the size of the structure to a proposed 8,900-square foot,two-story office <br /> building, including one(1)residential unit and a 36-stall parking lot, two (2)of which <br /> will be ADA accessible. <br /> 3. Reason for the Request: According to the applicant,Final Plan Approval and a building <br /> permit were issued in 2011. However,based on cost considerations and the economy just <br /> coming off of a recession, construction was delayed, and plans were abandoned. The <br /> applicant subsequently submitted revised building plans in 2013,but due to a <br /> misunderstanding with the Department of Public Works(DPW), a building permit was <br /> never issued. In 2014, DPW issued a site work grading permit and some site work <br /> subsequently occurred. However,misunderstandings between the applicant and the then <br /> contractor resulted in lengthy litigation between the parties and construction was <br /> suspended during that time. With the litigation resolved, a new grading permit was issued <br /> in 2019 and site work re-commenced. Upon receipt of this time extension approval, a <br /> new Final Plan Approval can be obtained, a new building permit can be finalized, and the <br /> applicant intends to complete the project within 24 months. <br /> (P.D. Exhibit 1 -Change of Zone amendment application dated April 27, 2020 and <br /> email dated May 22, 2020 from Sidney Fuke) <br /> 4. Landowner: SW Enterprise LLC. <br /> STATE AND COUNTY PLANS <br /> 5. SLU Designation: Urban. <br /> 6. GP LUPAG Map: Medium Density Urban. <br /> 7. County Zoning:Neighborhood Commercial-20,000 square feet(CN-20) <br /> 8. Hilo Community Development Plan (CDP): The Hilo CDP, adopted as Planning <br /> Commission Resolution No. 1 on May 21, 1975,identifies the area as RS/RM/PUD. <br /> 9. Special Management Area (SMA): The subject property is located over <br /> one(1)mile from the shoreline at an elevation of about 240 feet above sea level and is <br /> not situated in the Special Management Area. <br /> DESCRIPTION OF PROPERTY AND SURROUNDING AREA <br /> 10. Subject Property: The property is located on the east side of Komohana Street just north <br /> of the Alenaio drainage channel. It is irregular in shape, slopes very slightly to the east, <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.