My WebLink
|
Help
|
About
|
Sign Out
Home
2020-08-26 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-08-26 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:05:44 PM
Creation date
8/19/2020 1:05:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb 2021 <br />Mar 2021 <br />Apr 2021 <br />May 2021 <br />June 2021 <br />Totals 3,800.06 8,778.34 <br /> <br />The above table is to include data on the waste disposed in the landfill (not the <br />greenwaste or recycling data). <br /> <br />WASTEWATER DIVISION PROJECTS AND UPDATES <br /> <br />1. COMPLIANCE <br />A. TREATMENT AND DISPOSAL: <br />• 08/04/20: Kaloko WWTP UIC Permit Annual O&M Inspection. WWTP received <br />an unacceptable O&M rating. Basis of Design Review/Mass Balance Technical <br />Memorandum submitted to DOH. <br />• 07/31/20: RFI Letter submitted to DOH for the Hilo Facilities Pretreatment <br />Program that is in place for the Hilo WWTP. Response to the RFI is required by <br />07/31/20. <br /> <br />B. COLLECTION SYSTEM: No report. <br /> <br />2. OPERATIONS <br />A. TREATMENT/COLLECTION SYSTEMS AND PUMPING STATIONS/ FORCE MAINS: <br />Unscheduled repairs/upgrades/replacement of failing equipment due to age and <br />prolonged wear and tear continue where necessary throughout the wastewater <br />facilities. <br /> <br />B. SAFETY PRACTICES/TRAINING: <br />WWD administration continues to review and update the Emergency Response <br />Procedures and the Standard Safety Procedures and the weekly safety meeting <br />agendas. <br /> <br />3. ADMINISTRATION <br />A. VACANT POSITIONS IN OPERATIONS: <br />• Operator IV (Hilo – 1 position): interview scheduled for 8/19/20. <br />• Operator Supervisor III (Kona – 1 position): new hire to start: 8/17/20. <br />• Assistant WWTPO (Kona – 1 position): selected candidate. Pending reference <br />checks. <br />• Lead Electrician (Hilo): recruitment in progress. <br />• Trades Helper (Kona): pending DHR recruitment. <br />10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.