My WebLink
|
Help
|
About
|
Sign Out
Home
2020-10-28 EMC Meeting Agenda and Director's Informational Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2020
>
2020-10-28 EMC Meeting Agenda and Director's Informational Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 11:24:49 AM
Creation date
10/21/2020 11:24:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• As required by HRS Chapter 342G, Mayor Kim appointed members to the Solid <br />Waste Advisory Committee (SWAC). The county’s SWAC is comprised of seven <br />members and had been meeting monthly. Input from SWAC members during the <br />ISWMP update process was crucial to ensure that the completed plan effectively <br />identified and addressed the County of Hawai‘i’s unique solid waste challenges. <br />• The SWAC had their first meeting in March 2018. The June and July meetings <br />were dedicated to helping the SWAC learn more about the county’s solid waste <br />and landfill diversion programs, and one of the tools used was to show the SWAC <br />many of the program’s facilities. During the SWAC meetings from August 2018 to <br />November 2018, the SWAC reviewed and utilized the 2009 plan recommendations <br />and options in developing their own recommendations and options. <br />• A draft plan was submitted to the SWAC during December 2018. The SWAC agreed to <br />proceed by submitting their individual comments to the plan in January 2019, followed by <br />group discussions of individual chapters during monthly SWAC meetings. The SWAC Draft <br />Plan review and consensus of proposed revisions spanned approximately 170 days. At <br />the end of each meeting, all SWAC members present motioned to approve all edits and <br />changes as discussed, and SWAC members were informed that their participation in these <br />meetings was part of the required 120-day comment period. <br />• The draft plan was submitted to the Department of Health on 08/21/19 for its 90- <br />day review. <br />• Two ISWMP informational meeting were held during December 2019, and two <br />public hearings were held during January 2020. <br />• The public comment period was open for 60 days, from 12/06/19 through <br />02/04/20. <br />• SWD staff reviewed the comments and testimony and prepared responses for the <br />SWAC to review. <br />• The SWAC met on 02/26/20 to review and discuss the DOH comments and the <br />public comments and testimony, and approved changes to the draft ISWMP. SWD <br />staff and Parametrix have finished the draft of the ISWMP. <br />• The following are the next steps for the implementation of the ISWMP: <br />◦ The draft ISWMP will be submitted to the County Council for adoption. <br />◦ The adopted ISWMP plan will be submitted to the DOH for approval. <br />◦ Appropriate components of the ISWMP should be incorporated into the budget <br />and into the operation of the relevant programs. <br /> <br />B. TRANSFER STATION RECYCLABLES (“TWO-BIN”) COLLECTION AND RECYCLING: <br />• The current contract will end on 03/31/21 or when commencement of services <br />begins under new procurement, whichever is earlier. A downsized acceptable list <br />of recyclables was implemented on 10/16/19 after discussions on deteriorating <br />world recycling market conditions. Two-Bin acceptable materials are now clean <br />corrugated cardboard and brown Kraft paper bags in one bin, and clean non-HI-5 <br />glass containers (no caps, covers or lids) in a separate glass bin. Clean metal cans <br />can be placed in the scrap metal bin at five of the recycling and transfer stations. <br />Overseas markets for recyclables are shrinking, and the value has been volatile. If <br />further market changes occur, program modifications may be implemented. <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.