My WebLink
|
Help
|
About
|
Sign Out
Home
RECOMMENDATION
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #2 Palamanui Global (AMEND REZ 09-000094)
>
RECOMMENDATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 1:02:57 PM
Creation date
11/12/2020 1:02:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
at a rate of approximately$4-5 million each year. The Palamanui Business Park is <br /> anticipated to accommodate approximately 75-95 businesses. Parking will be provided on <br /> the individual lots as required by the Zoning Code. Palamanui, the master developer,will <br /> provide subdivision improvements including curb, gutter, sidewalks, and on-street <br /> parking. <br /> The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicants,successors or assigns, and that <br /> are not the result or their fault or negligence. Since August 2013, the applicant has <br /> been consistently meeting with the Planning Department through its Kona CDP Design <br /> Center and has spent considerable time and money to create an updated Master Plan or <br /> "Regulating Plan",which in 2019 was determined by the Design Center to be consistent <br /> with the Kona CDP. According to the applicant's "Regulating Plan" submitted with a <br /> concurrent request to amend Project district Ordinance No. 09 132, development of the <br /> Business Park will occur during Phase III-IV. <br /> Because development of the Business Park is not anticipated to begin until Phase <br /> III of the overall Palamanui Development, the Planning Director recommends providing a <br /> ten(10)-year time extension to secure final subdivision approval rather than the standard <br /> five years requested by the applicant. Additionally,to ensure connectivity between the <br /> University Village and Business Park, the Planning Director recommends University <br /> Drive between Queen Ka`ahumanu Highway and Ane Keohokalole Highway and the <br /> University Drive-Queen Ka`ahumanu Highway intersection be completed prior to final <br /> subdivision approval. <br /> Since the MCX zoning was approved in 2009,the applicant has taken several <br /> steps in developing the property in accordance with the terms or conditions of approval, <br /> including providing road, water and electrical infrastructure,preparing a water master <br /> plan, rough grading University Drive, which provides access to the rezone area, and <br /> implementing the Integrated Natural Cultural Resource Management Plan to preserve <br /> natural and cultural resources on the property. Thus, the non-performance is the result of <br /> conditions that could not have been foreseen and were beyond the control of the <br /> applicant. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.