My WebLink
|
Help
|
About
|
Sign Out
Home
BACKGROUND & EXHIBITS
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #3 St. Michael the Archangel Catholic Church (AMEND SMA 10-000044)
>
BACKGROUND & EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 7:51:08 AM
Creation date
11/12/2020 7:51:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> I <br /> PLANNING DEPARTMENT <br /> ,oir-Ity of Hawaii <br /> t <br /> 1� , )f 44 Ane Kectiolk.)if Hwy <br /> September 14, 2020 KJ-1:1! o-Kona H 96/0 <br /> t <br /> t <br /> t <br /> Mr 'Michael Yee. Director <br />) County Of Hawaii <br /> Planning Department <br /> 1 101 Pauahi Street <br /> Hilo, Hawaii 96720 <br /> x Dear Mr. Yee, <br />) <br /> Subject: Special Management Area (SMA) Use Permit No. SMA 10-000044 <br /> Applicant: St. Michael the Archangel Catholic Church <br /> Request: Completion of Construction of New Parish Hall <br /> Subject: Time Extension Request for Condition No.3 <br /> I Tax Map key: 7-5-008-006 <br /> o <br /> J This letter is to requests a 5-year time extension to the existing Special Management Area (SMA) Use <br /> a Permit No. 10-000044 which expires on October 14, 2020. It is the intention of the Owner/Parish to <br /> 1 conform to Condition No.: 3 (complete construction of church and related improvements) of the SMA <br /> 4 Use Permit. <br /> 4 <br /> i <br /> I History: <br /> 1 <br /> 1 <br /> The following is a brief history of St. Michael the Archangel Church and what brought us to the <br />) <br /> improvements we are faced with today. <br /> The original St. Michael's Church was built in the 1850's, and after decades of weather and much-needed <br /> i renovations remains on the same property as the present church today. On October 15, 2006, a magnitude <br /> J 6.7 earthquake struck the west coast of the Big Island, causing significant structural damage to many <br /> buildings. including St. Michael the Archangel Church. A structural inspection of the building was <br /> conducted and deemed unsafe and it was demolished. <br /> Plans to rebuild the new church got under way and construction began in December 2012. <br /> j <br /> The first phase of construction included the main Church building. parish hall foundation, surrounding <br /> landscaping and parking This initial phase was completed in early February 2015. The first mass in the <br /> newly constructed Church was celebrated on March 15, 2015. <br /> The second phase of construction was postponed to allow the parish to work on fundraising to pay off the <br /> initial debt. <br /> Unanticipated delays prolonged debt reduction efforts. however, through hard work and the generous <br /> support from parishioners, the community and visitors alike helped in paying off the building debt <br /> incurred in the first phase of construction. <br /> In an effort to cut overall project costs the parish decided to reduce the scope of the second phase by <br /> reducing/eliminating the following: <br /> ■ Reduce the overall physical scope of the parish hall from a 2-story structure down to a single- <br /> story Parish Hall/Center maintaining the design and appearance of the existing chure1• i*l4 y-- -------- <br /> Planning Dept. �� � ' �`�' <br /> Exhibit I t'�' ��� I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.