My WebLink
|
Help
|
About
|
Sign Out
Home
RECOMMENDATION
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2020
>
2020-11-19 Leeward
>
Item #3 St. Michael the Archangel Catholic Church (AMEND SMA 10-000044)
>
RECOMMENDATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 7:54:04 AM
Creation date
11/12/2020 7:54:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Eliminate the Rectory Building initially proposed to be located in the northwest <br /> corner of the subject property, to be replaced with additional parking. <br /> • Eliminate the second driveway entering/exiting the subject property. <br /> The applicant states that the overall appearance of the project will result in a <br /> significantly reduced version compared to the original proposal. Landscaping and the <br /> coral shrine grotto that was completed in the first phase will remain. <br /> To expedite the start of construction, the applicant has begun acquiring the <br /> required building permits for the project. Final Plan Approval was granted on October 8, <br /> 2019, and is current until October 7, 2021. Additionally, the parish has received the <br /> approved foundation permit and is waiting for final approval of the vertical building <br /> permit. According to the applicant,they are currently working on finalizing contract <br /> negotiations with a local General Contractor for the project. <br /> The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicant, successors or assigns, and are <br /> not the result of their fault or negligence. According to the applicant, following the <br /> first phase of construction, there were unanticipated delays to debt reduction efforts, <br /> though the debt was eventually paid off. Subsequently, the parish decided to reduce the <br /> scope of the second phase of construction, thereby reducing the overall physical <br /> appearance of the project. The delays and redesign efforts have led to this time extension <br /> request. Therefore,the non-performance was a result of conditions that could not have <br /> been foreseen by the applicant and are not the result of the applicant's fault or negligence. <br /> Granting of the time extension would not be contrary to the General Plan, <br /> Kona Community Development Plan or Zoning Code. The General Plan Land Use <br /> Pattern Allocation Guide(LUPAG) Map designation for this area is Resort Node, which <br /> allows for a mix of visitor-related uses such as hotels, condominium-hotels <br /> (condominiums developed and/or operated as hotels), single family and multiple family <br /> residential units, golf courses and other typical resort recreational facilities, resort <br /> commercial complexes and other support services. <br /> The proposed development will complement the goals, policies and standards of <br /> the Land Use Element of the General Plan as the proposed church will encourage the <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.