Laserfiche WebLink
DEFRANCO: So, does all the traffic go directly on to Alii Drive? So, ingress and leaving, it's <br /> all right on that, right on to Alii Drive? <br /> ANDREWS: That's correct. Based on their proposed reduction of the second driveway access, <br /> or entry, that drive that was on the photograph would be the, the primary and sole. <br /> DEFRANCO: Okay. Thanks. Thank you. <br /> ANDREWS: Okay. <br /> CARR SMITH: Anything else? Alright, well welcome Stanley Haanio. Thank you for being <br /> here. <br /> HAANIO: Thank you. <br /> CARR SMITH: And if you'd like to,please raise your right hand. Do you swear or affirm to tell <br /> the truth before the Planning Commission today? <br /> HAANIO: Yes. <br /> CARR SMITH: Thank you. You can let us know your name, and your position, and if you <br /> received the County's recommendation, if you have any issues or concerns about it, and then <br /> anything else you want us to know about your project please. <br /> HAANIO: Okay. Good afternoon Chair Carr Smith, Vice Chair Kealoha, and the Leeward <br /> Planning Commission. Thank you for this opportunity to share what we're, our project is. And <br /> like Jessica had mentioned, we're, our project is actually being reduced from the initial phase <br /> which was initially the parish house was supposed to have been a two-story building, now it's a <br /> single story. We've eliminated the rectory building on the northwest side of the property, and <br /> also eliminating the second driveway which would be to the south corner, west corner, of the <br /> property. So, the whole project itself reduced significantly, I would say, compared to what it <br /> initially was. The parish hall, our, our intention is for the hall to mimic the design and theme of <br /> the existing church and color. It's going to be used primarily, or I should say only for church- <br /> related functions. We don't have any intentions of renting or leasing out the hall for outside use. <br /> Right now, everything that we've done so far, getting the permits, a contractor, and all that, <br /> everything is complete. We're just waiting for the final phase on the permitting process and the, <br /> hopefully with you folks' blessing, we can get the SMA extension. It's, it's pretty, to me, pretty <br /> cut and dry,just a reduction of the overall project and with the need to file for this extension. <br /> Initially, we were hoping to start and complete construction before the SMA expired, but I guess <br /> with a lot of construction projects, we had hurdles and delays, and that's one of the reasons why <br /> we are where we are today, needing to do the extension. So, we just got a couple of items that <br /> we're waiting for the Building Department to get back to us on regarding the building permit. <br /> Other than that, we're ready to go. <br /> CARR SMITH: And are you fine with the Planning Department's conditions that they put? <br /> 3 <br /> EXHIBIT C <br />