Laserfiche WebLink
g How much does it cost to transfer a permit? <br /> A: Each transfer application must be accompanied with cash or a check for One Hundred <br /> Dollars ($100.00) made to the "County Director of Finance" at the Building Division <br /> office prior to 3:00 pm. <br /> g What is the process to change or replace the architect or engineer of record? <br /> A: Should the Owner need or wish to change or replace the architect or engineer(A/E) of <br /> record the Permit Transfer form is not required but a letter from the owner to the <br /> Director of Public Works would be provided with the Tax Map Key, Permit number, and <br /> change of A/E. The new A/E would sign and acknowledge or provide a separate letter <br /> indicating his/her scope of work. This may be for changes/revisions or"construction <br /> observation" as required by State Statute 464. All documents prepared by the A/E must <br /> have the license holder's stamp and "wet" signature. <br /> The ownership of a property must be the same as listed on the Hawaii County Real <br /> Property website, corporation authority, deed, short form, trust, LLC or partnership <br /> documents provided for authorization of the signature. Often a notary is required to <br /> verify the signer has authority to sign in behalf of the above if not clearly noted in <br /> supporting documents. <br /> Rev 1/28/2021 nce Page 2 of 2 Permit Transfers <br />