Laserfiche WebLink
• Trades Helper (Kona): candidate selected —pre-employment status. <br />• Sewer Maintenance Repairer (Kona): currently in recruitment. <br />• WW Plant Mechanic (Kona): resubmitting RTF for open recruitment. <br />• Storekeeper (Kona): New hire started on 2/16. <br />B. VACANT POSITIONS AT RAILROAD OFFICE: <br />• Civil Engineer IV (1 position): reclassifying to CE V (for West -side) <br />• GIS Analyst I (Hilo): candidate withdrew; continuing recruitment <br />C. NEW POSITIONS (Need to Create Position Descriptions) <br />• Environmental Engineer III (Hilo): reclassifying to Maintenance Superintendent <br />• Program Manager (Reuse Spec I) (Kona): will begin recruit in FY21/22. <br />• WWTPO IV (Kona): packet submitted to Managing Director's office. <br />• WWTPO IV (Kona): packet submitted to Managing Director's office. <br />• Plant Electrician/Electronics Repairer: Re-classified position to island -wide <br />responsibility. <br />4. WASTEWATER CAPITAL IMPROVEMENTS <br />A. NA`ALEHU LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• WWTP Land has been selected. The state EA completion required prior to <br />purchase of land for the treatment/disposal facility. Initial archaeological, flora <br />and fauna checks are in progress. Revised AOC compliance completion of the <br />final EA is 07/23/21. EPA accepted a revised completion date of 08/27/23 for <br />completion of EA. <br />• Project Design is under re-evaluation with new Administration because total <br />project cost is approaching $80 million. Discussions with EPA are underway <br />regarding AOC milestone deadlines. <br />• The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies. <br />• Current Schedule: <br />11/2020: Complete Archaeology and Biology Field Studies. <br />01/2021: Field Study/Literature Review (FSLR) to SHPD for Review. <br />03/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication. <br />02/2022: Draft AIS to SHPD anticipated. <br />05/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />07/2023: Final EA publication. <br />01/2024: AMP approval from SHPD. <br />07/2025: WWTP and Phase 1 Collection System Design complete. <br />09/2025: Anticipated advertisement for bids -Phase 1 Construction. <br />07/2027: Na`alehu LCCs closure — Phase 1 construction complete. <br />B. PAHALA LARGE CAPACITY CESSPOOL REPLACEMENT: <br />• Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final <br />AIS was submitted to SHPD on 02/26/20 and approved on 04/20/20. <br />• Land acquisition for WWTP site is proceeding through condemnation process. <br />