Laserfiche WebLink
First of all, in terms of the nature of the project, Ione of the testifiers said that the, you know, <br /> the plans that accompanied the notices were like somewhat different from the 2017 plan; it is <br /> true, but, you know, it's not necessarily significantly different. What was provided was the plans <br /> that were originally approved, and generally, the plans that were approved in 2017 under the plan <br /> approval, were not significantly different in terms of the size and the scope, so on and so forth. <br /> Related to that was the question about, well, you know, in 2000-you know, when the initial <br /> estimate was granted, it was supposed to be for a residence as opposed to like a timeshare. At <br /> that time when it, what, the proposed use was going to be a condominium. Now the most recent <br /> iteration is to have a timeshare. But, nevertheless, what we are talking about is the form of <br /> ownership; you know, a condominium is owned by one, multiple, whereas like the timeshare, <br /> you have multiple ownership, nevertheless, it's one unit that's being now considered. So the <br /> plans in concept were approved. The more detailed plans were approved in 2017. And <br /> essentially, that is, the current thought of the applicant right now is to proceed with a plan that <br /> generally follows along those lines. Those plans were found in the applicant's, you know, <br /> submittal I think dated November 13''. But, and they were also found in the Planning <br /> Department's Exhibit number 7, you know, off your report. So if you want to see a little bit <br /> more details as far as what was approved back in 2017, I think those are your two primary <br /> references. Essentially, those plans kind of reflected a four-story, no higher than 45-foot <br /> structure, 46 three-bedroom units. The original plan called for like 48 two- and three-bedroom <br /> units. So what it amounts to right now is the approved plans in 2017 approved plans reflect like <br /> a two-unit reduction. I think the other thing to consider is that the approved plan now does not <br /> contain a 7,000-square foot retail, commercial retail area, whereas like the original plan called <br /> for like a retail kind of component, so you would have like traffic from the surrounding <br /> neighborhoods visiting, you know, the site, sort of like the, how the King Kamehameha shopping <br /> center, you know, the King Kamehameha Hotel is now operated by the Marriot, you know, you <br /> would have like a shopping area where it's not only caters to the occupants of the hotel but also <br /> visitors from outside. There may be like a small little sundry area for occupants of the project, <br /> but at this point in time they have abandoned the thought of having like a commercial area for, <br /> that would be geared for outside people coming into the complex. The approved plan back in 19, <br /> 2017 rather, you know, reflected 119 parking spaces; the minimum required for, you now, 48, or <br /> 46-unit condo is essentially only 58, but what they are proposing is 119. So essentially, they are <br /> having 60 more stalls. <br /> And, you know, as we pointed out at the last public hearing on this matter, you know, the <br /> applicant is going through like a value engineering, and they are trying to see like whether they <br /> really can construct the building as was approved back in 2017, and they are doing that right <br /> now. And they are going to make some adjustments to it, you know, based upon the value <br /> engineering, and nevertheless, they are going to have to come back again to the county Planning <br /> Department for recertification or new approval on a plan approval. So this relates to the second <br /> question that the commissioners had raised; that's the issue of the timetable. So based on the <br /> staff's recommendation, you know, they have a five-year window to complete. Now, obviously, <br /> they are going to do their best to complete it, because, you know, within that window, because <br /> they do not wish to reappear before this Planning Commission and, you know, like face also the, <br /> any adverse public or agency kind of comment relating to the project. They have an obligation <br /> to complete it, and that's, that's their goal right now. You know, like, we have to add a little bit <br /> of qualifier in terms of like the specific timetable, I mean, you know, the applicant's attorney did <br /> 5 <br /> EXHIBIT B <br />