My WebLink
|
Help
|
About
|
Sign Out
Home
Chapter 05 Construction Administrative Code
PublicDocuments
>
County Clerk - Council
>
County Clerk
>
County Code
>
Chapter 05 Construction Administrative Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 4:18:00 PM
Creation date
4/8/2021 4:27:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 5-3-3 H AWAI‘I C OUNTY C ODE <br />(c) No permit shall be issued to relocate any dwelling, accessory to a dwelling, or <br />portion thereof, that has sustained substantial damage. As used in this section, <br />“substantial damage” means damage of any origin sustained by a structure, <br />whereby the cost of restoring the structure to its undamaged condition would equal <br />or exceed fifty percent of the market value of the structure before damage occurred. <br />(d) Except as otherwise provided in subsection (b), the foundation, plumbing, and <br />electrical work at the final destination of the relocated building shall comply with <br />the provisions of the construction code for new structures and shall comply with <br />flood hazard regulations, land use ordinances and all other applicable laws. <br />(2020, ord 20-61, sec 2.) 5-3-3 <br />Section 5-3-4. Temporary permits; required. <br />(a) The authority having jurisdiction may authorize a permit for temporary structures <br />and temporary uses. A temporary permit for tents and similar structures shall be <br />limited to a period of not more than one hundred eighty consecutive days unless <br />regulated by the fire code. The authority having jurisdiction may grant one or more <br />extensions of time for additional periods not exceeding ninety consecutive days <br />each. Prior to the deadline, requests for extension shall be filed in writing with the <br />authority having jurisdiction, and demonstrate that circumstances beyond the <br />applicant’s control justify granting the extension request. A $50 fee is required for a <br />temporary permit. <br />(b) A temporary permit shall be required for, but not limited to, installation or <br />construction of the following structures for a period of not more than one hundred <br />eighty consecutive days: <br />(1) A tent or similar structure which is to be used for commercial or religious <br />purposes, such as rallies, festivals, amusements and sideshows; <br />(2) Props for films, television, or live plays and performances; or <br />(3) Structures, buildings, platforms, construction trailers, water tanks, or fences <br />used during the construction of a permitted structure. <br />(c) Tents of canvas, plastic or similar material shall not be used as a residence. <br />(d) The grant of a temporary permit pursuant to this section shall not be deemed to <br />grant authorization for any electrical or plumbing work to be done in a manner that <br />violates the provisions of the construction code or any other applicable laws. <br />(e) The permit may be canceled for cause by the authority having jurisdiction or the <br />fire department at any time before expiration of the time stated in the permit. <br />Upon such cancellation or upon the expiration of the time stated therein, the <br />structure or structures shall be promptly removed. <br />(2020, ord 20-61, sec 2.) 5-3-4 <br />Section 5-3-5. Separate permit; required. <br />A separate permit shall be required for each building or structure, provided that <br />one permit may be obtained for: <br />(1) Building or constructing a dwelling and its accessories, such as a fence, wall, <br />pool, and a garage; <br />SUPP. 9 (1-2021) <br />5-12 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.