Laserfiche WebLink
Article 3. Permits; When Required. <br />Division 1. Permits required. <br />Section 5-3-1. Permit required; generally. <br />Section 5-3-2. Factory-built housing. <br />Section 5-3-3. Relocation of buildings. <br />Section 5-3-4. Temporary permits; required. <br />Section 5-3-5. Separate permit; required. <br />Division 2. Permits not required. <br />Section 5-3-21. Permit exemptions. <br />Section 5-3-22.Building work; exempt. <br />Section 5-3-23.Electrical work; exempt. <br />Section 5-3-24. Plumbing work; exempt. <br />Section 5-3-25. Emergency work. <br />Article 4. Permit Application. <br />Division 1. Application. <br />Section 5-4-1. Application for permit. <br />Section 5-4-2. Plans, specifications, and other data. <br />Section 5-4-3. Engineers and architects; work. <br />Section 5-4-4. Contractors and specialty contractors; work. <br />Section 5-4-5. Review of application. <br />Section 5-4-6. Action on application. <br />Section 5-4-7. Withdrawal of application. <br />Section 5-4-8. Applications made prior to subsequent changes in applicable laws. <br />Division 2. Pre-approval. <br />Section 5-4-21. Plans for dwellings; pre-approval. <br />Article 5. Permits. <br />Section 5-5-1. Issuance. <br />Section 5-5-2. Posting. <br />Section 5-5-3. Designation of person, contractor, or subcontractor who will do work. <br />Section 5-5-4. Expiration. <br />Section 5-5-5. Extension. <br />Section 5-5-6. Retention of plans. <br />SUPP. 17 (1-2025) <br />ii <br /> <br />