Laserfiche WebLink
§ 5D-3-2 H AWAII C OUNTY C ODE <br /> <br />- when referring to construction below the inundation level, means <br />constructed to exclude moisture and withstand the hydraulic pressure resulting from <br />the anticipated depth of inundation. <br />(2020, ord 20-61, sec 4.) 5D-3-2 <br />Section 5D-3-3. General Requirements. <br />Contractor will provide a certified flood zone elevation mark on jobsite for flood <br />zone elevation reference point. <br />(2020, ord 20-61, sec 4.) 5D-3-3 <br />Section 5D-3-4. Services. <br />(1) Location. Service equipment shall be located above the inundation level, or where <br />permitted per chapter 27, shall be installed in a water-tight enclosure, room, or <br />vault, and shall be readily accessible in any case. <br />(2) Ground Fault Protection. Ground fault protection shall be provided for all <br />grounded wye electrical services. <br />(2020, ord 20-61, sec 4.) 5D-3-4 <br />Section 5D-3-5. Ground fault protection. <br />Approved ground fault circuit protection shall be provided for all feeder and branch <br />circuits below or extending into inundation level. <br />(2020, ord 20-61, sec 4.) 5D-3-5 <br />Section 5D-3-6. Wiring method and material. <br />Equipment such as transformers, fuses, panelboards, switchboards, disconnects, <br />circuit breakers, controllers and other devices used for control, disconnecting means, <br />ground fault protection, or overcurrent protection shall be located above the inundation <br />level, unless made of water-tight construction and permitted per chapter 27. <br />(2020, ord 20-61, sec 4.) 5D-3-6 <br />SUPP. 9 (1-2021) <br /> <br />5D-6 <br /> <br />