09/26/2019. COH requested and EPA granted on 06/01/2020 another extension <br />of the EA completion date of 08/27/23. <br /> Project Design is under re-evaluation because total project cost was approaching <br />$80 million, assuming UV disinfection and concrete lined lagoons. <br /> The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and County Bonds (CIP). <br /> Current Schedule: <br />11/2020: Complete Archaeology and Biology Field Studies. <br />10/2020: Field Study/Literature Review (FSLR) and AIS Plan logged by SHPD for <br />Review. <br />12/2020: SHPD requests an AIS in the project area and indicates current <br />proposed AIS testing strategy appears sufficient. <br />09/2021: Observation of geotechnical survey to provide further information <br />about project area geology and stratigraphy for Draft AIS anticipated <br />10/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication. <br />03/2022: Draft AIS to SHPD anticipated. <br />06/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />05/2023: Final EA publication. <br />02/2024: AMP approval from SHPD. <br />09/2025: WWTP and Phase 1 Collection System Design complete. <br />09/2025: Anticipated advertisement for bids-Phase 1 Construction. <br />06/2027: LCCs closure Phase 1 construction complete. <br /> <br />7 <br /> <br />