My WebLink
|
Help
|
About
|
Sign Out
Home
2021-05-06 Windward Exh B Island Naturals Properties SMA 21-079
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Minutes & Exhibits Transcripts
>
2003-2022 Exhibits Transcripts
>
2021
>
2021-05-06 Windward Exh B Island Naturals Properties SMA 21-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 2:21:43 PM
Creation date
6/3/2021 2:21:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGUINALDO: You may proceed Tom. <br /> RAFFIPIY: Let's see, on that site, on this drawing over here. Do you have, is there any barrier <br /> between that drive-through and the road. Is that a barrier there or is it going to be just simply <br /> just the curving and the road on the other side of the curve? Is there any proposed or anything <br /> proposed barrier, some kind of sound barrier or physical barrier between the road — <br /> JACKSON: Commissioner Raffipiy, this is Maija Jackson if I could answer that, sorry Tracie. <br /> This plan does not reflect landscaping. <br /> RAFFIPIY: Okay. <br /> JACKSON: But our County landscaping rule requires some landscaping or some type of fencing <br /> or barrier it can be a berm like a dirt berm to create separation between the edge of the property <br /> line and a drive-through. <br /> RAFFIPIY: Okay, thank you. The testifier mentioned about the ponding, the flooding in that <br /> area. I'm just wondering what kind of flooding impact will these whole pavement areas in these <br /> areas will be paved it's going to contribute to this area here because it is in here the modern <br /> areas. It really floods here really bad around this area. <br /> CAMERO: So, when we received Department of Public Works (DPW) Engineering's comments <br /> they did mentioned that the flood zone is X in this area. One of the requirements that they will <br /> have to do prior to getting plan approval after this process is that they will need to do their <br /> drainage study and that is one of the requirements based on code that they will need to complete <br /> for the area. <br /> RAFFIPIY: Thank you. <br /> KERN: And just to add to that, the requirement will be that any additional water generated on- <br /> site will have to be disposed of on-site and cannot venture onto an adjoining property or a <br /> roadway. <br /> AU: Tracey, I have another question. So, the proposed site plan just shows one entrance off of <br /> the main road and is it correct that there will not be any egress or outgoing traffic on Mililani <br /> Street? <br /> CAMERO: So, there's going to be one full movement entrance off of Mililani Street which will <br /> allow left in and left out, right in and right out off of Kekuana6`a Street. The applicant is <br /> proposing 2 right ins and 2 right outs off of Kekuana6`a Street and then the Hualani Street <br /> entrance will have the I full access movement as well similar to Mililani Street where you will <br /> have a left in and left out, right in and right out. <br /> AU: Could you show that on the site plan please? <br /> 6 <br /> EXHIBIT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.