My WebLink
|
Help
|
About
|
Sign Out
Home
2021-06-23 Director's Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2021
>
2021-06-23 - CANCELED
>
2021-06-23 Director's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2021 1:16:57 PM
Creation date
6/17/2021 1:16:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
all three CWSRF projects. AOC compliance completion of the final EA was <br />originally 10/05/2019 which was extended to 07/23/21 at COH request on <br />09/26/2019. COH requested and EPA granted on 06/01/2020 another extension <br />of the EA completion date of 08/27/23. <br />• Project Design is under re-evaluation because total project cost was approaching <br />$80 million, assuming UV disinfection and concrete lined lagoons. <br />•The project is planned for funding with Clean Water State Revolving Funds <br />(CWSRF) monies and County Bonds (CIP). <br />• Current Schedule: <br />11/2020: Complete Archaeology and Biology Field Studies. <br />10/2020:Field Study/Literature Review(FSLR) and AIS Plan logged by SHPD <br />for Review. <br />12/2020: SHPD requests an AIS in the project area and indicates current <br />proposed AIS testing strategy appears sufficient. <br />(We are here) <br />09/2021: Observation of geotechnical survey to provide further information about <br />project area geology and stratigraphy for Draft AIS anticipated <br />03/2022:Draft AIS to SHPD anticipated. <br />10/2022:Draft EAand Anticipated FONSI scheduled for OEQC publication. <br />06/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />08/2023: Final EA publication. <br />02/2024: AMP approval from SHPD. <br />09/2025:WWTP and Phase 1 Collection System Design complete. <br />09/2025:Anticipated advertisementfor bids-Phase 1 Construction. <br />06/2027: – Phase 1 construction complete. <br /> C. Capital Improvement Projects (CIP) <br />Please see attached Table for the listing of CIP projects under consideration for <br />the existing Wastewater Basins currently being served by the County. Both <br />Nalehu and Phala are new wastewater service areas for DEM - Wastewater <br />Division. EMC’s request for alternatives being considered does not currently exist <br />for many projects where the planning level effort have not been initiated. For <br />many of the repair/maintenance projects,effort is focused on repairing, <br />renovating, and upgrading components of that respective facility (i.e., pump <br />stations and wastewater treatment plants). For the CIP projects identified, the <br />total costs are estimated at $915,545,000. <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.