Laserfiche WebLink
VITOUSEK: Okay. Commissioner Van Pernis. You can speak; you're not on mute now. We can <br /> hear you. <br /> VAN PERNIS: Is that statement mean that there will be new trees planted as for each live tree <br /> removed? Is the milo trees to replace, or replace the live trees that are to be removed? <br /> KOMATA: Yes, the reason we are putting back, or installing milo trees with the project is to <br /> offset the impact of the trees that are being removed. So, the plans currently call for three milo <br /> trees, 25-gallon containers, 6-to 8-foot height, 2-inch caliper. <br /> VAN PERNIS: Thank you. <br /> VITOUSEK: You have any further questions, Commissioner Van Pernis? <br /> VAN PERNIS: No. <br /> VITOUSEK: Any other questions from commissioners? Commissioner Yates, please proceed. <br /> You got ten minutes and you're on mute right now. <br /> YATES: Okay. Just some questions I had. Why are you going smaller; how long is this project <br /> going to take; and what is the traffic impact? And right now, I notice that in the photo that the <br /> parking area was closed off, is there a reason why that area is closed off? And, are you, well, <br /> you'll be adding more parking spaces to what's proposed? I mean, I, I'm guessing based on the <br /> picture I saw. And you said stumps of the trees to be taken out; are there trees or stumps that <br /> need to go? I agree, the stumps need to go, the stumps need to go. And in that area there, is that a <br /> cesspool or is that septic? Those are my questions. <br /> KOMATA: That's a lot of questions. I don't know if I'll be able to hit them all, but— <br /> YATES: <br /> utYATES: [Laughs.] <br /> KOMATA: So, the removal, the project does call for removal of stumps from trees that either <br /> previously were taken down or fallen. But we're also removing, I think it was at least two trees, <br /> two either Ficus macrocarpa, Chinese banyan trees, to make way for the accessible ramp that <br /> connects to Alii Drive and two of the accessible amenities the picnic table and the barbeque grill <br /> that we're putting in. And we're, again, we're planting back three sizable milo trees in their <br /> place. Construction, we would anticipate somewhere between six to eight months, maybe <br /> quicker, but that's, that's our thought right now. There will be impacts to, some impacts to traffic <br /> on Alii Drive because the work that's going to occur at the entrance to the park, along the <br /> shoulder of Alii Drive. But that won't be for the duration of the project. It might be for a limited <br /> point of time. The bathroom, or the comfort station is connected to the municipal sewer system <br /> currently. It was connected in our, the County's island-wide large capacity cesspool conversion <br /> efforts back between 2005 and 2010. Somewhere in that timeframe. So, you know, yeah, there's <br /> been comments about cesspools and sewage on-site that hasn't been an issue since we connected <br /> to the sewer line over 10, 12 years ago. <br /> 9 <br /> EXHIBIT C <br />