Laserfiche WebLink
Dec 2020 16,326.19 <br />Jan 2021 15,740.65 <br />Feb 2021 14,956.72 <br />Mar 202117,914.90 <br />Apr 2021 17,222.15 <br />May 2021 17,163.90 <br />Jun 2021 16,952.91 <br />Totals196,367.67 <br />3c. MONTHLY TRANSFER STATION TONNAGES (FY 20-21) <br />Month/YearEHRSSWHSL <br />Jul 2020 3,800.068,778.34 <br />Aug 2020 3,673.558,386.36 <br />Sept 2020 3,421.878,089.05 <br />Oct 2020 3,543.858,280.06 <br />Nov 2020 3,719.657,936.21 <br />Dec 2020 3,911.849,058.94 <br />Jan 2021 3,942.908,791.50 <br />Feb 2021 3,430.007,748.00 <br />Mar 2021 3,827.428,581.64 <br />Apr 2021 3,567.618,588.27 <br />May 2021 3,712.928,789.57 <br />Jun 2021 3,724.738,615.02 <br />Totals44,276.40101,642.96 <br />The above table is to include data on the waste disposed in the landfill (not the <br />greenwaste or recycling data). <br /> <br />4.WASTEWATER DIVISION <br />1. WASTEWATER CAPITAL IMPROVEMENTS <br />A. <br /> Project Design is under re-evaluation with total project cost approaching $45 <br />million. Discussions with EPA regarding estimated WWTP construction costs <br />increasing from $14.6 million to $20.6 million because WWTP site has steeper <br />slopes than predicted. Also, geotechnical borings confirmed the WWTP site has <br />underground voids due to lava tubes. Unknown lava tubes will add additional <br />construction costs should they be encountered during construction. EPA is trying <br />to determine what effects these changes have on the NEPA Environmental <br />Assessment (EA) that was completed last March 2020. County’srequestfor an <br />extension of the current AOC milestone “Design of WWTP” deadline approved <br />5 <br /> <br /> <br />