My WebLink
|
Help
|
About
|
Sign Out
Home
2021-07-28 - Director's Report
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2021
>
2021-07-28
>
2021-07-28 - Director's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 11:35:40 AM
Creation date
7/22/2021 11:35:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/2021: Observation of geotechnical survey to provide further information about <br />project area geology and stratigraphy for Draft AIS anticipated <br />03/2022:Draft AIS to SHPD anticipated. <br />10/2022:Draft EA and Anticipated FONSI scheduled for OEQC publication. <br />06/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. <br />08/2023: Final EA publication. <br />(Note: EPA Compliance deadline for the following milestones were given the <br />same August 2023 deadlineas the EA.) <br />02/2024: AMP approval from SHPD. <br />09/2025:WWTP and Phase 1 Collection System Design complete. <br />09/2025:Anticipated advertisementfor bids-Phase 1 Construction. <br />06/2027:LCCs closure –Phase 1 construction complete. <br /> C. Capital Improvement Projects (CIP) <br />Please see attached Table for the listing of CIP projects under consideration for <br />the existing Wastewater Basins currently being served by the County. Both <br />- Wastewater <br />Division. EMC’s request for alternatives being considered does not currently exist <br />for many projects where the planning level effort have not been initiated. For <br />many of the repair/maintenance projects, effort is focused on repairing, <br />renovating, and upgrading components of that respective facility (i.e., pump <br />stations and wastewater treatment plants). For the CIP projects identified, the <br />total costs are estimated at $915,545,000. <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.