My WebLink
|
Help
|
About
|
Sign Out
Home
2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2021
>
2021-09-22
>
2021-09-22 EMC testimony
>
2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 3:16:42 PM
Creation date
9/20/2021 8:18:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 4 6 <br />BrownAam . <br />Caldwell ' <br />zzcW AI LUKU,EHAW All n>. <br />D FNL Lmr FlAv D <br />u FK <br />aMIN aMB6 <br />CLO50] OPENO] OPEN FEMOIE LOW LML HIGH LLlf1 AR f <br />➢C ZKI YC FlR <br />'Mel amm aNIm oAIM amlq oulm A DESIGN/BUILD <br />SCADA HMI SCADA HMI DOCUMENTS <br />q I s q q W <br />MBR PLC — — — — — MBR PLC THESE DRAWINGS WERE <br />PREPARED FOR SUBMISSION TO <br />EPA IN JULV 2021 TO PROVIDE A <br />GENERAL UNDERSTANDING OF <br />THE PROJECT CONCEPT AND <br />MCC MCC ARENOTINTENDEDTOREFLECT <br />1— — — — — — — —I — — — — — — DESIGN REQUIREMENTS. <br />TiSHT P20B <br />A00 I I I I I I <br />A WASH <br />Rff <br />C C <br />L, UPPER PERMEATE <br />Z50 y U TRIF SIFT P204 <br />aA M I <br />a��,'+�µ �rY° <br />DZMBI� y C LTOOCOLTE <br />LCTPERMON <br />PROCE55 AIR aM°I ^y w: <br />FROM BLOW42S _______ __ _____ __ <br />T PAHALA <br />I WASTEWATER <br />L i TREATMENT PLANT <br />T T DESIGN/BUILD <br />DOCUMENTS <br />I REVISIONS <br />I i I I I I <br />II I �PGN <br />B I I I L4 LSH 8 <br />A FROM PRE AWERAR IN BASIN amlq oMm <br />AT <br />I I I I I II III IJ I o � F�� 12E� <br />� I I I I I I I J aDMB6 <br />I I rl I L.I LII LJ r 1 Z oE51GNEo. <br />I I �1rI JJ I I <br />I I ill lllj <br />ICI Ill llli ICI N 3'-WS e TO WAS-01 <br />wA <br />NiI1 L.l FE-07018fi <br />1 4 1 FlLENnIn <br />L J I BIPaHPMG�UMBE' <br />15 <br />SMU-070111 SMU-070121 SMU- CLIENT aRaECT I — - <br />(FUTURE (FUTURE MEMBRANES) <br />P&IDS <br />MB-01 MEMBRANE <br />A MEMBRANE 01 REACTOR BASIN BIOREACTOR A <br />TNK-070100 <br />BASIN <br />GRnwING NUIn Ea <br />P-203 <br />12 - EFl 25 <br />1 2 3 4 5 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.