My WebLink
|
Help
|
About
|
Sign Out
Home
2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2021
>
2021-09-22
>
2021-09-22 EMC testimony
>
2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 3:16:42 PM
Creation date
9/20/2021 8:18:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N. -- — <br />NM01 NM01 <br />g1f1 <br />IlR <br />NOIM <br />SCADA HMI — — — — — — — <br />— <br />— — <br />MBR PLC <br />u <br />I <br />MCC <br />I <br />I <br />I <br />I <br />REMOTE 1/0 CABINET 2 — — — — — <br />I <br />I <br />— — — <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />— — <br />PROCESS P1R <br />I <br />I <br />I <br />i <br />I <br />A - — — <br />- — — — - <br />FROq E<OVhRS— — — — — — — — - <br />— — — —— — — — — — — <br />— —, <br />L <br />I <br />� <br />T <br />E FRON NB-01 <br />I <br />I <br />REF SHT P207 <br />I <br />n <br />I <br />I Li <br />9N01 <br />I <br />LE-190102 <br />WAS <br />WAS STORAGE BASIN <br />TNK-190100 <br />RNL <br />N0111 <br />RUNNING Run PDIOIE HQ R- HIGH ugsr <br />- H <br />III Ngll IHII 19N11 19N11 <br />q 01 <br />—J <br />1901II Hq --- 19M11 <br />I I <br />� , I <br />I , - <br />I I ur � I lunn Isdn <br />-j — — <br />i I r-- <br />� I I <br />� I I <br />� , I <br />I ; � <br />� I I <br />� , I <br />I I I <br />� I I <br />� , I <br />� , I <br />� , I <br />I I I <br />� I I <br />� , I <br />� , I <br />� , I <br />I I I <br />� I I <br />� , I <br />� I I <br />� I I <br />� , I <br />� , I <br />DESIGN/BUILD <br />— SCADA HMI DOCUMENTS <br />— — — — MBR PLC <br />I THESE DRAWINGS WERE <br />PREPARED FOR SUBMISSION TO <br />EPA IN JULV 2021 TO PROVIDE A <br />GENERAL UNDERSTANDING OF <br />THE PROJECT CONCEPT AND <br />MCC <br />ARENOTINTENDEDTOREFLECT <br />— — — — <br />DESIGN REQUIREMENTS. <br />REMOTE 1/0 CABINET 2 <br />E <br />k <br />PAHALA <br />WASTEWATER <br />TREATMENT PLANT <br />DESIGN/BUILD <br />DOCUMENTS <br />REVISIONS <br />acNEo- <br />CKED <br />ROVED <br />Fl2"'E <br />o Pi DS.Dw <br />auEHT PRaEcr IUNIER <br />P&IDs <br />WAS STORAGE <br />BASIN a <br />oRwwc 1U11EE <br />P-210 <br />19 - ER 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.