Laserfiche WebLink
(1) <br />PPAͷIKOUWWTPΑALLREHABPROJECTSTOTAL$33.1M <br />ESTIMATEDCOST <br />PROJECTTITLE($inmillions) <br />Headworks/PreliminaryTreatment$6.6 <br />PlantwideValves&Gates1.7 <br />CriticalEquipment2.4 <br />CriticalSupportFacilities4.9 <br />AerobicDigesters3.9 <br />ChemicalHandlingSystem3.3 <br />SecondaryTreatment8.7 <br />SolidsDewatering1.6 <br />TOTAL$33.1 <br />(1)Includes all ÒsoftÒ costs to deliver a complete project including engineering, legal, administrative, and <br />contingency. ENRCCI = 11650 (January 2022). <br />33 <br />MajorChallenge3:Personnel <br />Recruitment,Retention,Maintenance: <br />¤Statewideissue,butsomeoneneedstotaketheinitiativetofix <br />¤Thepayisverylowforseasonedengineersinthewastewaterfield,certified <br />wastewateroperators(GradeIII&IV),andjourneymanelectricians <br />¤Recruitmentprocessistoolongandneedsstreamlining. <br />34 <br /> <br />