My WebLink
|
Help
|
About
|
Sign Out
Home
WPC PROPOSED FINDINGS OF FACT, CONCLUSIONS OF LAW, DECISION AND ORDER
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-11-04 Windward
>
Item #3 Connections/CBESS (SPP-12-000138)
>
WPC PROPOSED FINDINGS OF FACT, CONCLUSIONS OF LAW, DECISION AND ORDER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2021 1:53:56 PM
Creation date
10/26/2021 1:53:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19. July 30, 2021, the Commission received briefs from CBESS, Intervenor <br /> Gomes, and the Planning Department. Connections submitted a letter joining CBESS's brief. <br /> 20. On August 5, 2021,the Commission voted to decide on the record as <br /> presented and continue the hearing to the Commission's October 7, 2021 meeting to allow time <br /> to review the voluminous record. <br /> 21. On October 7, 2021, after review of the entire record on appeal, hearing <br /> public testimony and presentations by the Parties, the Commission voted to approve SPP 12- <br /> 000138 based on the Planning Director's October 31, 2012 revised recommendation with <br /> conditions ("PD's Recommendation"), which was adopted. <br /> II. PROPOSED DEVELOPMENT <br /> A. Description of Proposed Use <br /> 22. Special Permit Application SPP 12-000138 proposes the development of a <br /> K to 12 charter school campus with dorm facilities, and an intergenerational program that would <br /> provide childcare and elder care at a single facility on the Property, together with related uses on <br /> the 70-acre parcel of land. As the site is bisected by Edita Street,the lower portion of the <br /> Development would consist of the major school or campus facilities,while the upper portion <br /> would be used for outdoor educational programs, including a forestry preservation program. <br /> 23. The lower campus would support a projected 167 elementary students, <br /> 107 intermediate students, 107 high school students (381 K through 12 students) and 25 <br /> intergenerational clients. Also included would be a dormitory capable of supporting 30 students, <br /> a gymnasium, kitchen/dining facility, library/resource center, caretaker's residence and other <br /> related facilities. Two parking lots with a total of 140 parking stalls would be provided. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.