Laserfiche WebLink
19. July 30, 2021, the Commission received briefs from CBESS, Intervenor <br /> Gomes, and the Planning Department. Connections submitted a letter joining CBESS's brief. <br /> 20. On August 5, 2021,the Commission voted to decide on the record as <br /> presented and continue the hearing to the Commission's October 7, 2021 meeting to allow time <br /> to review the voluminous record. <br /> 21. On October 7, 2021, after review of the entire record on appeal, hearing <br /> public testimony and presentations by the Parties, the Commission voted to approve SPP 12- <br /> 000138 based on the Planning Director's October 31, 2012 revised recommendation with <br /> conditions ("PD's Recommendation"), which was adopted. <br /> II. PROPOSED DEVELOPMENT <br /> A. Description of Proposed Use <br /> 22. Special Permit Application SPP 12-000138 proposes the development of a <br /> K to 12 charter school campus with dorm facilities, and an intergenerational program that would <br /> provide childcare and elder care at a single facility on the Property, together with related uses on <br /> the 70-acre parcel of land. As the site is bisected by Edita Street,the lower portion of the <br /> Development would consist of the major school or campus facilities,while the upper portion <br /> would be used for outdoor educational programs, including a forestry preservation program. <br /> 23. The lower campus would support a projected 167 elementary students, <br /> 107 intermediate students, 107 high school students (381 K through 12 students) and 25 <br /> intergenerational clients. Also included would be a dormitory capable of supporting 30 students, <br /> a gymnasium, kitchen/dining facility, library/resource center, caretaker's residence and other <br /> related facilities. Two parking lots with a total of 140 parking stalls would be provided. <br /> 4 <br />