Laserfiche WebLink
be required by the DPW Traffic Division. According to the applicant, in 2013 the <br /> applicant contributed $500,000 to the Department of Public Works to install traffic <br /> signals for the intersection of Kupuna Place and Mohouli Street. <br /> 21. Waiakea Pond/Alenaio Stream/Waiakea Stream: The Waiakea Pond is the closest <br /> body of water to the proposed project area, situated downstream approximately 1 '/2 miles <br /> northeast from the subject property. The nearby Alenaio Stream is located approximately <br /> 1,500 feet to the north and the Waiakea Stream is located 3,000 feet to the south and <br /> downslope of the subject property. According to the Hale Ola O Mohouli FEA, the <br /> proposed project is not expected to have any direct impact on any streams, wetlands, <br /> aquifer resource or marine waters. <br /> PUBLIC UTILITIES AND SERVICES <br /> 22. Access: Access to the subject property is proposed from Kupuna Place by way of an <br /> easement over the adjacent parcel TMK: (3) 2-4-001:176 and Mohouli Street, both <br /> County roadways. Kupuna Place is a two-lane paved roadway with an existing pavement <br /> width of 32 feet within a 50 feet wide right-of-way. Mohouli Street is classified as a <br /> major collector road with an existing pavement width of 80 feet. <br /> 23. Water: County water is available to the property via a 12-inch waterline running within <br /> Mohouli Street and a 12-inch waterline running within Kupuna Place. Finally, the <br /> Department of Water Supply (DWS) indicated that the existing 12-inch waterline within <br /> Mohouli Street and Kupuna Place is adequate to provide the required 2,000 gallons per <br /> minute flow for fire protection, as per DWS Water System Standards. <br /> 24. Wastewater: The applicant will connect to the County sewer system, which is available <br /> along Kahikini Street in the adjacent subdivision to the north via easements along TMKs: <br /> (3) 2-4-001:176 and 2-4-001:177. <br /> 25. Solid Waste: The applicant indicated that the solid waste generated by the proposed <br /> project will be disposed at appropriate sites designated by the Department of <br /> Environmental Management. <br /> 26. Essential Utilities and Services: Electricity, cable and telephone are available to the site. <br /> Police, fire protection and emergency medical services are located in Hilo within two <br /> miles from the property. <br /> -5- <br />