Laserfiche WebLink
Waiver # <br />Description <br />Availability <br />Period <br />Ends <br />HCV -6 Automatic <br />. Allows PHA to extend the period of time after the last HAP payment is <br />12/31/21 <br />Termination of <br />made before the HAP contract terminates automatically. <br />HAP Contract <br />. OHCD will extend the 180 Automatic Termination to 12/31/21, <br />whichever is later. <br />HCV -7 Increase <br />0 Provides PHAs with the option to increase the payment standard (PS) <br />12/31/21 <br />in Payment <br />for the family at any time after the effective date of the increase, rather <br />Standard During <br />than waiting for the next regular reexamination. <br />HAP Contract <br />. OHCD will increase the PS for all families who are rent burdened <br />Term <br />effective 7/1/21. <br />HQS-1 Initial <br />0 Changes initial inspection requirements, allowing for owner certification <br />12/31/21 <br />1 nspection <br />Requirements <br />HQS-2 PBV Pre- <br />e Changes inspection requirements, allowing for owner certification that <br />12/31/21 <br />HAP Contract <br />there are no life-threatening deficiencies <br />Inspections <br />0 Where self -certification was used, PHA must inspect the unit no later <br />than 6/30/22 <br />6/30/22 <br />HQS-31nitial <br />. Allows for extension of up to 30 days for owner repairs of non -life- <br />12/31/21 <br />Inspection: NLT <br />threatening conditions <br />Deficiencies <br />HQS-5 <br />. Allows for delay in biennial inspections <br />12/31/21 & <br />HOS Inspection <br />. All delayed biennial inspections must be completed as soon as <br />6/30/22 <br />Requirement: <br />reasonably possible but by no later than 1 year after the date on which <br />Biennial <br />the biennial inspection would have been required absent the waiver. <br />Inspections <br />HQS-6 HQS <br />0 Waives the requirement for the PHA to conduct interim inspection and <br />12/31/21 <br />Interim <br />requires alternative method <br />Inspections <br />. Allows for repairs to be verified by alternative method <br />HQS-10 Housing <br />o Waives the requirement that each dwelling unit have at least 1 bedroom <br />Remains in <br />Quality <br />or living/sleeping room for each 2 persons. <br />effect one <br />Standards: <br />year from <br />Space and <br />lease term or <br />Security <br />date of this <br />Notice, <br />whichever is <br />longer <br />MS -3 Mainstream <br />As an alternative requirement, the PHA may choose to expand the <br />12/31/21 <br />Age Eligibility to <br />definition of an eligible non -elderly family member to include those who <br />Enter HAP <br />were <br />Contract <br />Statutory <br />Authority <br />