My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT (PL-SMA-2021-000003)
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-11-18 Leeward
>
Item #7 Waikoloa Land Company (PL-SMA-2021-000003)
>
PD RECOMMENDATION REPORT (PL-SMA-2021-000003)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2021 11:29:36 AM
Creation date
11/8/2021 11:29:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
on Water Resources of the Kumu Hou Project which was completed in June 2021 by <br /> Tom Nance. The study revealed that the current amount of nutrients discharging to <br /> nearshore waters would be reduced with the development of the proposed project. It is <br /> assumed that by reducing the area of active golf course greens coupled with an increased <br /> use of R-I treated wastewater applied as irrigation will result in a reduction in the total <br /> nutrient load entering the groundwater flux towards the ocean. Additional long-term <br /> impacts include an increase of impervious surface from the transition from golf course to <br /> residential uses. An increase in stormwater runoff could cause soil erosion and elevate <br /> potential impacts to groundwater from common residential pollution such as oil/gas from <br /> vehicles, animal waste, and soap/cleaners that enter the groundwater system. The use of <br /> drywells to address on-site drainage, not directing stormwater towards the ocean, and <br /> compliance with the Chapter 27,Flood Control, Hawaii County Code, will mitigate the <br /> potential impacts of increase stormwater inputs to the nearshore/ocean area. Additional <br /> Best Management Practices (BMPs) such as site appropriate landscaping and efficient <br /> sprinklers will also aim to mitigate impacts from the increase in stormwater. These will <br /> be added as conditions of approval. <br /> To address the potential impacts of the proposed development on water quality, <br /> marine resources, and coastal ecosystems the applicant will implement BMPs as part of <br /> the National Pollutant Discharge Elimination System (NPDES) permit process as well as <br /> complying with Chapter 10, Erosion and Sedimentation Control, Hawaii County Code, <br /> and State Department of Health (DOH) water pollution control regulations. Additionally, <br /> a condition of approval of the concurrent Project District rezoning will require any uses <br /> within the project area that create wastewater to connect to the Waikoloa Beach Resort <br /> Wastewater Treatment Plant which will bolster the amount of R-1 treated wastewater <br /> being applied for irrigation purposes. <br /> In addition to the BMPS mentioned above, a condition of approval will require <br /> the applicant to update the resort's Water Quality Monitoring Plan and program (as <br /> required by the LUC D&O for the entire WBC) to ensure any project related impacts to <br /> groundwater and ocean water are appropriately measured, monitored, and mitigated <br /> meeting with the requirements of the State Department of Health. <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.