Loading...
HomeMy WebLinkAboutPD RECOMMENDATION REPORT (PL-REZ-2021-005) RKumuHouAreaBPDREZ.crk.11.2.21 COUNTY OF HAWAII PLANNING DEPARTMENT RECOMMENDATION WAIKOLOA LAND COMPANY CHANGE OF ZONE APPLICATION (PL-REZ-2021-000005) Upon careful review of the request,the Planning Director is recommending that a favorable recommendation for a Project District zoning district request be forwarded to the County Council. This recommendation does not, however, sanction the plans submitted with the application as they may be subject to change given the specific code and regulatory requirements of the affected agencies. Since this recommendation is made without the benefit of public testimony, the Director reserves the right to modify and/or alter this position based on additional information presented at the public hearing. This favorable recommendation is based on the following findings: Waikoloa Land Company has requested a Change of Zone from an Open, Multiple Family Residential-4,000 square feet(RM-4), Multiple Family Residential-6,000 square feet(RM-6), Multiple Family Residential-8,000 square feet(RM-8) and Village Commercial-10,000 square feet to a Project District(PD) zoning (hereinafter Kumu Hou Project District) for 133.822 acres of land identified as "Area B" of the proposed Kumu Hou at Waikoloa project(Kumu Hou). The requested Kumu Hou PD is a 133.822 portion of the larger Kumu Hou at Waikoloa Master Plan area and includes the following proposed components: ■ Timeshares: 900 multi-family residential timeshare units, at a density of no more than 7.3 units per acre. ■ Community/Commercial Facilities: Up to 43,000 square feet of community and commercial facilities,which could consist of: o Up to 40,000 square feet of community facilities including one or two private community centers with sales and meeting facilities, pool(s), and other facilities to support the timeshare units; and o A convenience retail center of approximately 3,000 square feet is planned near the community center. -1- ■ Golf Support Facilities: Relocation of the existing golf clubhouse to support a new, approximately 20,000 square foot golf clubhouse including cart storage, food, and beverage facility(ies) and other service or support facilities; relocation of the existing golf driving range to include putting greens and other ancillary facilities; and a new cart path in support of the relocated facilities. ■ Operations: Up to 32,000 square feet of building area to support back-of- house housekeeping and other services in support of the timeshare units. ■ Recreation: Approximately three (3) acres of public parks, pedestrian paths, and recreational amenities. ■ Associated landscaping, internal roads, cart paths, approximately 200 parking stalls for employee and other parking, loading areas and related infrastructure which is consistent with the proposed uses. The development is proposed to be constructed in three (3)phases over a 17-year period (2026—2043). However, the applicant notes that these timeframes are conceptual and for modeling purposes, and that actual implementation of the Project District master plan will be dependent on a myriad of factors (e.g., economic, market, finance, community, environmental, etc.) that will manifest over time. Based on the preceding and given that the Kumu Hou project is being developed in a long-established resort area where future plans are unlikely to change, the Planning Director believes that a development timetable is not warranted, thus he is not recommending a condition setting a development period for the PD. The PD is intended to provide for a more flexible and creative planning approach rather than specific land use designations. It will also allow for flexibility over time in the location of specific uses and mixes of structural alternatives. This planning approach would establish continuity in land uses and designs while providing for a comprehensive network of infrastructure facilities and systems. A variety of uses as well as open space, parks, and other project uses are intended to be in accord with each individual PD objective. A PD is an -2- amendment to Chapter 25,Zoning Code, which changes the district boundaries in accordance with the individual PD. A PD may be established whenever the public necessity and convenience and the general welfare require that a comprehensive planning approach for an area should be adopted. In addition, a PD may only be established if the proposed district: 1. Is consistent with the intent and purpose of the Chapter 25 (Zoning Code), Hawaii County Code and the County General Plan; and 2. Will not result in a substantial adverse impact upon the surrounding area, community, or region. The Change of Zone request from Multiple Family Residential (RM-4, RM-6, and RM-8) and Village Commercial (CV-10) to Project District (Kumu Hou) is consistent with the intent and purpose of the General Plan and the Zoning Code. The General Plan Land Use Pattern Allocation Guide (LUPAG) Map designation for the subject properties is Resort Node (ren). These areas include a mix of visitor-related uses such as hotels, condominium-hotels (condominiums developed and/or operated as hotels), single family and multiple family residential units, golf courses and other typical resort recreational facilities,resort commercial complexes, and other support services. Only major resort areas are identified as Resort Nodes on the LUPAG Map Additionally, the proposed Kumu Hou PD will implement several goals and policies of the Land Use (Resort) and Economic elements of the General Plan and will be developed to comply with pertinent standards therein. These include: Land Use Element(Resort) ■ Maintain an orderly development of the visitor industry. ■ A major resort area is a self-contained resort destination area that provides basic and support facilities for the needs of the entire development. Such facilities shall include sewer, water, roads, employee housing and recreational facilities, etc. A major resort area is designated as a Resort node or part of a Resort node on the LUPAG Map. -3- ■ Promote and encourage the rehabilitation and the optimum utilization of resort areas that are presently serviced by basic facilities and utilities. ■ Lands currently designated Resort should be utilized before new resorts are allowed in undeveloped coastal areas. ■ Zoning of resort areas shall be granted when the proposed development is consistent with and incorporates the stated goals,policies, and standards of the General Plan. ■ Coastal resort developments shall provide public access to and parking for beach and shoreline areas. ■ Require developers to provide the basic infrastructure necessary for development. The Kumu Hou PD is located in the mauka area of the Waikoloa Beach Resort(WBR), designated as a major resort area by the General Plan. The PD will be developed as part of the adaptive re-use of the existing resort area that will repurpose nine (9) holes of the existing King's Golf Course (King's Course) to accommodate the proposed timeshare development, community and commercial uses, golf course support facilities, park and recreational facilities, and related improvements. As part of the development, the applicant is proposing to provide a minimum of 20.8 acres of land for open space (17.8 acres of natural and renaturalized lava) and recreational uses, including three (3) acres for active recreational uses via two (2) public"gateway"parks located at the intersection of Ala Ihi Way/and the southern end of Waikoloa Beach Road, and other pedestrian pathways, sidewalk, and public access facilities. In order to facilitate the timely development of recreational facilities, the applicant proposes to complete construction of the proposed parks prior to occupancy of the first multiple-family residential structure. Additionally,the Director recommends that the public access paths shown in Figure 23 are developed at the same time. The preceding will be added as conditions of approval. Furthermore, while this area is not considered a coastal development, proposed public access facilities will be developed to connect the PD area to -4- existing shoreline public accesses makai of the resort. A condition of the concurrent SMA Use Permit for this area will require an update to the existing approved public access plan to incorporate these new proposed facilities and public access connectivity. Finally, while the affordable housing requirements for the WBR have been satisfied with the donation of 300 net acres of land to the County within Waikoloa Village, the applicant proposes to develop not less than 142 units of affordable workforce rental housing on a 25.4-acre site south of the Queens' Marketplace. While not considered part of the Kumu Hou Master Plan, the applicant considers this initiative complementary to the development of the overall Kumu Hou project and has signed a memorandum of intent with a developer to commence planning of the project. Economic Element ■ Encourage the development of a visitor industry that is in harmony with the social,physical, and economic goals of the residents of the County. ` ■ Strive for an economic climate that provides its residents an opportunity for choice of occupation. ■ Require a study of the significant cultural, social and physical impacts of large developments prior to approval. ■ The land, water, air, sea, and people shall be considered as essential resources for present and future generations and should be protected and enhanced through the use of economic incentives. ■ Identify and encourage primary industries that are consistent with the social,physical, and economic goals of the residents of the County. ■ Promote a distinctive identity for the island ofHawai`i to enable government, business and travel industries to promote the County of Hawai`i as an entity unique within the State ofHawai`i. This proposed development will provide additional and expanded employment opportunities including an estimated 350 Full Time Employment (FTE) construction and related jobs annually in the early development phase (2021 to 2026), 1,450 FTE development and operation jobs generated as -5- timeshare units are completed for occupancy (2027 to 2042) and 1,080 FTE on- going jobs at full buildout. Further, the magnitude of this project will directly benefit the residents of the County as the real property tax base will substantially increase. The proposed PD area is covered by the South Kohala Community Development Plan (SKCDP). Several SKCDP goals, policies, and actions reference resort areas, including directing the development of timeshares to the district's three (3) major destination resorts. Other goals, policies, and actions include: protection of historical, natural, and cultural resources; requiring water conservation measures for new, large scale development projects; ensuring the quality of South Kohala's groundwater and marine resources (including the expansion of water quality monitoring); providing support for water and wastewater facility upgrades; promoting the prohibition of future injection wells in the SMA if wastewater is not treated to an R-1 level of water quality; fostering the preservation of scenic views and landscapes, and conducting all activities and uses with clear environmental stewardship and sustainability methods. While many of the preceding goals,policies, and actions are not explicitly directed at resort areas, they have been incorporated into the Kumu Hou project proposal, and conditions related to the preceding are included in the concurrent SMA Use Permit for the project area. The Zoning Code is one of the tools used to implement the General Plan and is one of the County's primary land use control mechanisms; the Zoning Code sets the various types of uses allowed in a specific zoning districts. In this particular case, the applicant proposes to establish a PD to provide flexibility in the location of land uses without identifying where these uses would be specifically located on the property at this early stage of development. A minimum of 50 acres is required to establish a Project District. The request meets this criterion as "Area B"is approximately 133.8 acres in size. The Zoning Code allows Project District Zoning to include any permitted uses either directly or conditionally allowed in the RS, RD, RM, RCX, CN, CG, CV, or V zoning districts to also be permitted in a PD. The uses proposed -6- throughout the Kumu Hou PD appear to be allowed within the Resort-Hotel (V) zoning district and are consistent with the resort node LUPAG designation. Additionally, while not expressly proposed in the application, the applicant indicated that the project area will invariably have/need retail uses (such as restaurants and shops to service the needs of the guests/residents) and offices to support those uses (such as for the timeshare/recreational activities and the like). Based on the preceding, the Planning Director is adding a condition to this recommended approval that will limit uses in the PD to largely those permitted in the V zoning district, along with golf related facilities, which would otherwise require a separate Use Permit to develop. It should be noted,however, that the concurrent SMA Use Permit for the area only permits the uses articulated in the application, thus any additional uses (e.g., a restaurant, bar, or expanded commercial area),would require an amendment to the SMA Use permit. Pursuant to the concurrency section of the Zoning Code (HCC 25-2- 45(d)), the applicant submitted a Traffic Impact Report(TIR)that assessed the traffic impacts of"Areas A and B" of the Kumu Hou project("Area C' is not expected to generate any meaningful traffic). The TIR studied three (3) intersections in the vicinity of Kumu Hou which include Queen Ka`ahumanu Highway/Waikoloa Beach Drive (South); Queen Ka`ahumanu Highway/Waikoloa Beach Drive (North); and Queen Ka`ahumanu Highway/Mauna Lani Drive; the report found that all three (3) intersections currently operate at acceptable levels- of-service (LOS) (between LOS A and LOS D) in the AM and PM peak hours. The applicant noted that data used for the analysis was collected in 2019 at traffic count survey stations along the highway and at Waikoloa Road. The use of the 2019 data was due to the lack of accurate traffic data attributed to the ongoing Covid-19 pandemic at the time of the study. For purposes of the TIR, Kumu Hou was assumed to be fully built-out by 2045, at which time,the project was expected to generate 356 and 430 new vehicular trips during the project's AM and PM peak hours,respectively. The TIR concluded that while the LOS ratings along Queen Ka`ahumanu Highway could be worse in 2045 compared to 2019,these declines are expected to be the result of -7- regional growth rather than directly attributable to the Kumu Hou development. The TIR provided several recommendations to mitigate future traffic impacts, including the provision of adequate site distance, adequate loading and turn-around areas for service, delivery and refuse collection vehicles, sufficient turning radii, wayfinding/destination signage, improved pedestrian facilities including ADA sidewalks, shared use and other facilities, bicycle facilities, and shuttle services. The applicant has also stated that the preparation of additional traffic studies will be completed to verify projected traffic after the completion of the 676 residential/timeshare units, or if project conditions should change significantly. After review of the draft TIR,the State Department of Transportation (DOT) provided comments that disagree with some of the TIRs analysis and resulting findings,the most significant of which is the study's reliance on the possibility of future widening of Queen Ka`ahumanu Highway in the vicinity of the project. DOT requested that the TIR be revised to re-analyze future traffic conditions without the widening assumption. Additionally, DOT further requested that the report be updated to identify future direct impacts from the project to State roadways (if any) and any appropriate mitigation measures, and that the applicant commit to implementing them as required and approved by DOT. Further, DOT suggested that the TIR be updated to include follow-up activities including commitments that local and fair regional mitigation be implemented, planned updates to the TIAR, suggest, permitting triggers, articulate fair share agreements for regional improvements, and implement other standard DOT requirements as needed. According to the applicant, upon subsequent consultation with their traffic engineer, the TIR analysis included the widening of Queen Ka`ahumanu Highway in the Year 2045, at full project buildout, and not sooner which would have negatively impacted level of service within the first five (5)years of the project. Thus, the TIR meets Zoning Code (Section 25-2-46) concurrency requirements, and the applicant has committed to submitting an updated TIAR as recommended in the TIR prior to development of the 400th multiple-family residential unit -8- within the Project District area. This new study would provide an updated traffic baseline and update findings and proposed mitigation based on the new data for review and approval by the Planning Department in consultation with DOT. The preceding will be added as a condition of approval. The concurrency section of the Zoning Code (HCC Section 25-2-46(0)) also requires the provision of a Civil Defense siren to provide adequate warning coverage across the entire project site as part of a rezoning that proposes 25 or more residential units.Neither of the existing sirens situated in the makai area of the WBC (installed after the 2011 tsunami)have the required audible range to provide the necessary coverage for the Kumu Hou PD. Thus, a condition of approval will require the installation of a civil defense siren prior to issuance of Certificate of Occupancy for any structure within the project area. Various conditions of approval have been added to ensure the development complies with other sections of the Zoning Code related to landscaping, off-street parking and loading, building density, minimum yards and setbacks, and building height limits. Based on the preceding, the request is consistent with the General Plan, South Kohala CDP, and the Zoning Code. The request for a Project District will not result in a substantial adverse impact upon the surrounding area, community, or region. The Kumu Hou Project District area is within the Waikoloa Beach Resort complex, which encompasses approximately 1,353 acres between the Queen Ka`ahumanu Highway and the ocean. The WBR resort complex includes open spaces (two (2), 18-hole golf courses and natural lava fields), three (3)resort hotels and timeshare developments, resort residential multi- and single-family units,two (2) commercial shopping centers, a performance amphitheater, a golf clubhouse, a beach clubhouse, and related improvements. Immediately to the north is the Mauna Lani Resort and adjacent to the south are undeveloped State-owned lands. The PD project area is located within the mauka portion of the WBR on lands currently developed by the King's Course as well as vacant lands. As such, it is -9- anticipated that the proposed resort related development planned for the project area should complement the uses in the surrounding community. The development could have the potential to adversely affect surrounding properties if mitigation measures were not required. However, several conditions of approval will mitigate adverse impacts of the project related to noise, air quality (dust), and drainage. For example, the applicant will prepare a drainage study, aquire the necessary permits, and construct necessary improvements in order to contain all development-generated runoff on-site and all earthwork (grubbing and grading) shall be conducted in accordance with applicable County Code. The applicant is required to comply with various State Department of Health standards by controlling dust during construction and reducing the effect of construction equipment noise. Additionally, the Planning Department's landscaping requirements will further minimize the effect of lighting, noise, odors, and dust by providing buffers along the project site perimeter, as required. The PD will be developed with all essential utilities and services. Conditions of approval will require any development to secure potable water from the private Waikoloa Water System and connect to the private sewer system. As represented by the applicant on-site wastewater will be treated to an R-1 water quality standard at the Waikoloa Beach Resort Water Wastewater Treatment Plant to be used to irrigate the remaining golf courses. Irrigation water for the other landscaped areas in the PD will be supplied by a new brackish water well and irrigation system being developed as part of the overall Kumu Hou project. Access to the proposed 900 multi-family timeshare units and community center/commercial facilities is conceptually planned from two (2)points on Waikoloa Beach Drive (North) that link to an internal road. The first access point would be approximately 1,100 feet makai of the northernmost intersection of Waikoloa Beach Drive (North) and Queen Ka`ahumanu Highway which is a signalized intersection. The second access point would be approximately 4,400 feet makai of that, or approximately 400 feet mauka of the intersection of Waikoloa Beach Drive (North) and Ala Ihi Way. Access to the proposed parks, -10- golf facilities, and operational facilities is conceptually planned from Ala Ahi way at its intersection with Waikoloa Beach Drive (South). Despite recommendations made by the Traffic Impact Report and as conceptually represented in the Kumu Hou Master Plan to develop the main internal road with sidewalk facilities, the applicant clarified their intent to develop roadway infrastructure to the Resort Standards in the Subdivision Code, with the option to add sidewalks. As similar Project District Zoning for other resorts in the area require the same, the Director recommends adding a condition of approval to require that all new internal roadways may be developed to the Subdivision Code's Resort Standards. The preceding and all other internal resort infrastructure and community facilities will be developed and maintained privately. Police, fire, medical, and emergency services are available nearby. According to a comment memo from the Police Department, the increase in population resulting from the 1,000+time share units (within the overall Kumu Hou project) will lead to an increased burden on public safety services such as police and fire/rescue. A condition of approval will require the applicant or successor to pay a fair share contribution to mitigate potential regional impacts from the development. In addition, the Planning Department will review site plans for each phase of development that are consistent with the overall master plan to ensure the following: ■ Adequate light and air, as well as proper siting and arrangements of all structures and improvements are provided. ■ Existing and prospective traffic movements will not be hindered. ■ Proper landscaping is provided that will be commensurate with the development or use and its surroundings. ■ Unsightly areas are properly screened (visually) or eliminated. ■ Adequate off-street parking is provided to serve the development or use. ■ Access to the parking areas will not cerate potential accident hazards; and -11- ■ Within reasonable limits, any natural and man-made features of community value are preserved. As stated above, potential impacts associated with this project development such as traffic, drainage, and other design concerns will be mitigated through conditions of approval. Therefore, the request would not unreasonably burden the public agencies to provide roads and streets, sewer, water, drainage, school improvements, police and fire protection, and other essential services. The proposed PD zone change would allow for uses that complement the surrounding resort uses in the area. The development will to the extent feasible, reasonably protect native Hawaiian rights if they are found to exist. In view of the Hawaii State Supreme Court's `DASH" and "Ka Pa`akai O Ka`Aina"decisions, the issue relative to native Hawaiian rights, such as gathering and fishing rights, must be addressed in terms of the cultural, historical, and natural resources and the associated traditional and customary practices of the site. Investigation of valued resources: A Draft Archaeological Inventory Survey (AIS) of the subject property was completed by Haun &Associates in May 2021 and amended in August 2021 and again in October 2021. A Native Hawaiian Traditional and Customary Practices Assessment was prepared by Christopher Monahan, Ph.D. in June 2021. In addition, a Biological Survey was conducted by Ron Terry, Ph.D. in May 2021 for the subject area which concluded in a Biological Survey report dated May 2021. The report, which was submitted with the application, included results of field surveys conducted in May 2020 and November 2020 for the entirety of the project area. The valuable cultural, historical, and natural resources found in the PD area. The most recent draft AIS identified 14 sites with a total of 418 features, 13 complexes with two (2) to 240 component features within the Kumu Hou PD area. The 14 sites identified in the AIS include nine (9) sites previously identified in archaeological studies of the area and five (5) newly identified sites, all of which were assessed as significant under criterion"d" (yielding information important for research on history or prehistory). Of these, three (3) sites have also -12- been deemed significant under criterion"e" (cultural value) and proposed for preservation via a site preservation plan,these include Site 26871 (trail) and portions of the Site 31230 (trail), which were identified as part of a mauka-makai trail network, and Site 26873, which was identified as the location of a previously excavated lava tube and other features on a pahoehoe rise. The trail portions discussed above appear to be part of the overall trail network linking to the natural pahoehoe area and the other trail sites and possibly led makai bound trail users in the direction of the ancient Ala Loa and/or towards `Anaeho`omalu Bay.No further work or preservation is recommended for the other I I of the 14 identified sites. The final draft AIS determines the three (3) sites as significant under criterion "d" and"e" and recommends their preservation pursuant to a required preservation plan to be approved by SHPD. The Native Hawaiian Traditional and Customary Practices Assessment found that given the distance from the shoreline there would be no impacts to shoreline fishing and gathering. The assessment recommended the submission of an AIS to SHPD, further consultation with agencies to agree on significance and mitigation, and an assessment of the project by a hydrogeology expert to assess groundwater and aquifers in this region. The biological survey report found that there are no designated or proposed critical habitats for endangered plant or animal species located within the project area. The study also concluded that no federally listed threatened or endangered plant species appear to be present on the property,nor are there any rare plant species or uniquely valuable vegetation types. Two (2) federally listed threatened and endangered avian species (nene and ae`o) and four(4) species of concern (`auku`u, `akekeke, `ulili and kolea) were identified within the project area; although not detected during the survey, it is possible that small numbers of the endangered endemic Hawaiian Petrel,the endangered band romped storm petrel, and the threatened Newell's shearwater birds may fly over the area between summer and fall. Similarly, Hawaiian hoary bats are assumed to be present and have been detected in kiawe forests of West -13- Hawaii as well as the endangered Blackburn sphinx moth which has also been found at various locations throughout West Hawaii. Possible adverse effect or impairment of valued resources and feasible actions to protect native Hawaiian rights: While the proposed project may have some effect on valued resources in the area, the proposed conditions of approval of the concurrent SMA Use Permit should minimize impacts to protect native Hawaiian rights. Native vegetation may be destroyed by ground alternation and construction activities, however, there is no evidence that the flora in the area is particularly desired or used for cultural practices. There are no identified springs, pu`u, native forest groves, gathering resources, or other natural features present on or near the project site that would support traditional resource uses. Any project related impacts on endangered or listed fauna will be addressed by conditions of approval of the concurrent SMA Use Permit as recommended by the US Fish and Wildlife Service and Department of Land and Natural Resources-Division of Forestry and Wildlife. As mentioned above, impacts on identified archaeological resources will be addressed through the approval of a draft AIS and Archaeological Preservation Plan for sites identified for preservation. As archaeological remains could inadvertently be uncovered during development activities, a condition of approval will be added to address and mitigate any inadvertent finds. Lastly, Hawaiian fishing/gathering rights will not be affected by this project and as there is no direct public access to the shoreline or mountains located withing the PD area. With implementation of the mentioned conditions of approval the proposed action will not affect traditional Hawaiian rights. Lastly, this recommendation is made with the understanding that the applicant remains responsible for complying with all other applicable governmental requirements in connection with the proposed use, prior to its commencement or establishment upon the subject properties. Additional -14- governmental requirements may include the issuance of building permits, compliance with the Fire Code, installation of improvements required by the American with Disabilities Act(ADA), among many others. Compliance with all applicable governmental requirements is a condition of this approval; failure to comply with such requirements will be considered a violation that may result in enforcement action by the Planning Department and/or the affected agencies. Based on the preceding findings, the request to rezone the property from an Open, Multiple Family Residential-4,000 square feet (RM-4), Multiple Family Residential-6,000 square feet (RM-6), Multiple Family Residential-8,000 square feet (RM-8) and Village Commercial-10,000 square feet to a Project District (PD) zoned district would result in an appropriate land use pattern that would further benefit the general public. The accompanying draft bill to amend Section 25-8-9 (Puako-Anaehoomalu Zone Map) is provided for your favorable consideration. Please note the proposed conditions of approval attached to the draft bill. -15- MsV Of N COUNTY OF HAWAII STATE OF HAWAII �OF•K�.I� BILL NO. ORDINANCE NO. AN ORDINANCE AMENDING SECTION 25-8-9 (PUAKO-`ANAEHO`OMALU ZONE MAP), ARTICLE 8, CHAPTER 25 (ZONING) OF THE HAWAII COUNTY CODE 1983 (2016 EDITION, AS AMENDED), BY CHANGING THE DISTRICT CLASSIFICATION FROM OPEN (0), MULTIPLE-FAMILY RESIDENTIAL (RM-4), MULTIPLE-FAMILY RESIDENTIAL (RM-6), MULTIPLE-FAMILY RESIDENTIAL (RM-8) AND VILLAGE- COMMERCIAL (CV-10) TO PROJECT DISTRICT (PD)AT WAIKOLOA, SOUTH KOHALA, HAWAII, COVERED BY TAX MAP KEYS: 6-9-008: POR. 013, 022, 025, POR. 029 AND 033. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII: SECTION 1. Section 25-8-9, Article 8, Chapter 25 (Zoning) of the Hawaii County Code 1983 (2016 Edition, as amended) is amended to change the district classification of property described hereinafter as follows: The district classification of the following area situated at Waikoloa, South Kohala, Hawaii, shall be Project District(PD): AREA 1 Beginning at the Southeast corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station "PU`U HINAI" being 4,838.74 feet North and 33,353.00 feet West and thence running by azimuths measured clockwise from True South: I. Along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457), on a curve to the left with a radius of 1,560.00 feet,the chord azimuth and distance being: 95° 16' 28" 372.92 feet; -1- 2. Thence on a curve to the right with a radius of 20.00 feet,the chord azimuth and distance being: 132° 19' 17.5" 27.74 feet; 3. 176° 14' 306.45 feet; 4. Thence on a curve to the left with a radius of 840.00 feet,the chord azimuth and distance being: 170° 19' 30" 172.93 feet; 5. 164° 25' 394.94 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 6. Thence on a curve to the right with a radius of 760.00 feet, the chord azimuth and distance being: 179° 49' 15" 403.75 feet; 7. 195° 13' 30" 97.17 feet; 8. 275° 42' 446.03 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424) and Lot A of Waikoloa Beach Resort— King's Course Resubdivision No. 2 (File Plan 2462); 9. 44° 46' 278.34 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 10. 346° 12' 191.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 11. 21' 08' 129.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 12. 353° 15' 106.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); -2- 13. 315° 00' 476.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 14. 335° 42' 215.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 15. 43° 00' 219.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 16. 11' 10' 62.65 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457)to the point of beginning and containing an area of 12.027 Acres. AREA 2 Beginning at the Northeast corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station "PU`U HINAI" being 7,232.42 feet North and 32,849.12 feet West and thence running by azimuths measured clockwise from True South: 1. 354° 24' 80.00 feet along Lot 6 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 2. 8° 40' 76.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 3. 29° 53' 78.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 4. 4° 07' 109.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 5. 37° 37' 100.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision -3- No. 2 (File Plan 2462); 6. 77° 55' 95.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 7. 90° 39' 125.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 8. 125° 13' 43.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 9. 179° 20' 59.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 10. 134° 58' 169.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 11. 139° 31' 105.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 12. 177° 44' 130.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 13. 158° 28' 23.78 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 14. 198° 46' 65.86 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 15. 288° 46' 27.00 feet along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), same being the South side of Waikoloa Beach Drive; 16. Thence along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision -4- (File Plan 2424), same being the South side of Waikoloa Beach Drive, on a curve to the left with a radius of 1,240.00 feet, the chord azimuth and distance being: 276° 35' 523.38 feet to the point of beginning and containing an area of 4.505 Acres. AREA 3 Beginning at the Northeast corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station "PU`U HINAI" being 7,819.70 feet North and 29,422.45 feet West and thence running by azimuths measured clockwise from True South: 1. Along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457), on a curve to the left with a radius of 20.00 feet, the chord azimuth and distance being: 59° 30' 10" 27.43 feet; 2. 16° 12' 375.33 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 3. Thence along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457), on a curve to the right with a radius of 450.00 feet, the chord azimuth and distance being: 51' 51' 524.55 feet; 4. 87° 30' 291.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 5. 11' 00' 130.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); -5- 6. 57° 31' 590.60 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 7. 52° 23' 949.21 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 8. Thence along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457), on a curve to the right with a radius of 450.00 feet, the chord azimuth and distance being: 53' 31' 632.87 feet; 9. 56° 00' 208.54 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 10. 167° 40' 40.54 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 11. 144° 43' 445.11 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 12. 160° 40' 371.98 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 13. 233° 12' 68.88 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 14. 317° 56' 517.89 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 15. 309° 40' 360.70 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 16. 269° 35' 68.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision -6- No. 2 (File Plan 2462); 17. 231° 40' 247.66 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 18. 210° 23' 134.82 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 19. 153° 05' 273.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 20. 141' 55' 317.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 21. 259° 45' 590.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 22. 224° 26' 233.24 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 23. 221° 02' 466.65 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 24. 272° 55' 152.57 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 25. 237° 40' 116.76 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 26. 282° 46' 26.28 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 27. 331' 29' 48.37 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); -7- 28. 310° 39' 33.76 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 29. 256° 35' 40.98 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 30. 228° 07' 48.72 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 31. 238° 42' 49.72 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 32. 275° 54' 49.77 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 33. 288° 52' 49.26 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 34. 254° 13' 45.05 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 35. 276° 16' 117.27 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 36. 267° 30' 333.53 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 37. 223° 05' 320.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); 38. 188° 20' 88.00 feet along Lot A of Waikoloa Beach Resort—King's Course Subdivision No. 2 (File Plan 2462); -8- 39. 286° 12' 13.34 feet along Lot 5 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 40. 196° 12' 310.85 feet along Lot 5 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 41. Thence along Lot 5 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), on a curve to the left with a radius of 20.00 feet, the chord azimuth and distance being: 152° 53' 50" 27.43 feet; 42. Thence along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), same being the South side of Waikoloa Beach Drive, on a curve to the left with a radius of 740.00 feet, the chord azimuth and distance being: 286° 12' 87.63 feet to the point of beginning and containing an area of 21.720 Acres. AREA 4 Beginning at the North corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station"PU`U HINAI"being 7,819.70 feet North and 29,422.45 feet West and thence running by azimuths measured clockwise from True South: 1. Along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), same being the South side of Waikoloa Beach Drive, on a curve to the left with a radius of 740.00 feet, the chord azimuth and distance being: 279° 18' 45" 90.17 feet; 2. 55° 38' 170.56 feet along Lot A of Waikoloa Beach -9- Resort—RM-6 Subdivision (File Plan 2457); 3. 196° 12' 100.96 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 4. Thence along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462), on a curve to the right with a radius of 20.00 feet, the chord azimuth and distance being: 239° 30' 10" 27.43 feet to the point of beginning and containing an area of 0.144 Acres. AREA 5 Beginning at the Southwest corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station "PU`U HINAI" being 4,859.43 feet North and 33,907.85 feet West and thence running by azimuths measured clockwise from True South: I. Along Lot 2 of Waikoloa Beach Resort—Golf Villas Subdivision (File Plan 2376), on a curve to the left with a radius of 760.00 feet, the chord azimuth and distance being: 183' 43' 40" 502.66 feet; 2. 344° 25' 15.11 feet; 3. Thence on a curve to the right with a radius of 760.00 feet, the chord azimuth and distance being: 350° 19' 30" 156.46 feet; 4. 356° 14' 306.32 feet; 5. Thence on a curve to the right with a radius of 20.00 feet, the chord azimuth and distance being: -10- 40° 31' 06" 27.93 feet; 6. 84° 48' 12" 65.28 feet to the point of beginning and containing an area of 0.235 Acres. AREA 6 Beginning at the South corner of this parcel of land, the coordinates of said point of beginning referred to Government Survey Triangulation Station"PU`U HINAl"being 4,308.92 feet North and 33,786.00 feet West and thence running by azimuths measured clockwise from True South: 1. 115° 38' 28" 726.58 feet along Lot R-1 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712), same being the North side of Waikoloa Beach Drive; 2. Thence along Lot R-1 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712), same being the North side of Waikoloa Beach Drive, on a curve to the left with a radius of 1,030.00 feet, the chord azimuth and distance being: 102° 00' 47" 485.37 feet; 3. 88° 23' 06" 130.49 feet along Lot R-1 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712), same being the North side of Waikoloa Beach Drive; 4. Thence along Lot R-1 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712), same being the North side of Waikoloa Beach Drive, on a curve to the right with a radius of 940.00 feet, the chord azimuth and distance being: 89° 33' 33" 38.52 feet; 5. 180° 44' 11.95 feet along Lot 2 of Waikoloa Beach Resort—Golf Villas Subdivision (File Plan 2376); -11- 6. 264° 48' 12" 1,172.28 feet along Lot 2 of Waikoloa Beach Resort—Golf Villas Subdivision (File Plan 2376); 7. Thence along Lot 2 of Waikoloa Beach Resort—Golf Villas Subdivision (File Plan 2376), on a curve to the left with a radius of 760.00 feet, the chord azimuth and distance being: 203' 54' 06" 22.89 feet; 8. 264° 48' 12" 65.28 feet; 9. Thence on a curve to the left with a radius of 20.00 feet,the chord azimuth and distance being: 220° 31' 06" 27.93 feet; 10. 176° 14' 306.32 feet; 11. Thence on a curve to the left with a radius of 760.00 feet,the chord azimuth and distance being: 170° 19' 30" 156.46 feet; 12. 164° 25' 394.94 feet along Lot 2 of Waikoloa Beach Resort—Golf Villas Subdivision (File Plan 2376) and Lot 3 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712); 13. Thence along Lots 3 and 4 of Waikoloa Parcel 4 Subdivision No. 3 (File Plan 1712), on a curve to the right with a radius of 840.00 feet, the chord azimuth and distance being: 179° 49' 15" 446.25 feet; 14. 285° 13' 30" 70.00 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 15. 195° 13' 30" 95.49 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course -12- Subdivision (File Plan 2424); 16. 275° 42' 10.13 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 17. 15° 13' 30" 97.17 feet; 18. Thence on a curve to the left with a radius of 760.00 feet,the chord azimuth and distance being: 359° 49' 15" 403.75 feet; 19. 344° 25' 394.94 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 20. Thence on a curve to the right with a radius of 840.00 feet, the chord azimuth and distance being: 350° 19' 30" 172.93 feet; 21. 356° 14' 306.45 feet; 22. Thence on a curve to the left with a radius of 20.00 feet,the chord azimuth and distance being: 312° 19' 17.5" 27.74 feet; 23. Thence along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457), on a curve to the right with a radius of 1,560.00 feet,the chord azimuth and distance being: 275° 16' 28" 372.92 feet; 24. 191° 10' 62.65 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 25. 223° 00' 219.00 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 26. 155° 42' 215.00 feet along Lot B of Waikoloa Beach -13- Resort—RM-6 Subdivision (File Plan 2457); 27. 135° 00' 476.00 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 28. 173° 15' 106.00 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 29. 201' 08' 129.00 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 30. 166° 12' 191.00 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 31. 224° 46' 278.34 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 32. 95° 42' 435.88 feet along Lot B of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 33. 195° 13' 30" 54.03 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 34. Thence along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), on a curve to the left with a radius of 540.00 feet, the chord azimuth and distance being: 178° 41' 45" 307.26 feet; 35. 162° 10' 140.67 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 36. Thence along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), on a curve to the right with a radius of 460.00 feet, the -14- chord azimuth and distance being: 184° 42' 30" 352.69 feet; 37. 207° 15' 341.29 feet along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 38. Thence along Lot 8 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), on a curve to the right with a radius of 20.00 feet, the chord azimuth and distance being: 248° 39' 54.4" 26.46 feet; 39. Thence along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), same being the South side of Waikoloa Beach Drive, on a curve to the left with a radius of 2,040.00 feet,the chord azimuth and distance being: 289° 25' 24.4" 46.77 feet; 40. 288° 46' 267.31 feet along Lot 13 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424), same being the South side of Waikoloa Beach Drive; 41. 18° 46' 65.86 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 42. 338° 28' 23.78 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 43. 357° 44' 130.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 44. 319° 31' 105.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); -15- 45. 314° 58' 169.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 46. 359° 20' 59.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 47. 305° 13' 43.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 48. 270° 39' 125.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 49. 257° 55' 95.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 50. 217° 37' 100.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 51. 184° 07' 72.00 feet along Lot 7 of Waikoloa Beach Resort—King's Golf Course Subdivision (File Plan 2424); 52. 303° 21' 404.58 feet; 53. 273° 47' 569.52 feet; 54. 250° 08' 151.36 feet; 55. 244° 33' 457.04 feet; 56. 227° 29' 48.22 feet; 57. 209° 46' 32.81 feet; 58. 264° 41' 40.10 feet; 59. 241° 08' 41.49 feet; -16- 60. 222° 26' 550.70 feet; 61. 203' 09' 69.96 feet; 62. 179° 26' 33.14 feet; 63. 223° 41' 14.22 feet; 64. 294° 43' 195.09 feet; 65. 272° 30' 388.79 feet; 66. 280° 42' 534.25 feet; 67. 317° 06' 94.21 feet; 68. 43° 05' 122.02 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 69. 87° 30' 333.53 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 70. 96° 16' 117.27 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 71. 74° 13' 45.05 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 72. 108° 52' 49.26 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 73. 95° 54' 49.77 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); -17- 74. 58° 42' 49.72 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 75. 48° 07' 48.72 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 76. 76° 35' 40.98 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 77. 130° 39' 33.76 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 78. 151° 29' 48.37 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 79. 102° 46' 26.28 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 80. 57° 40' 116.76 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 81. 92° 55' 152.57 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 82. 41' 02' 466.65 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); -18- 83. 44° 26' 233.24 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 84. 79° 45' 590.00 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 85. 321' 55' 317.00 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 86. 333° 05' 273.00 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 87. 30° 23' 134.82 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 88. 51' 40' 247.66 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 89. 89° 35' 68.00 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 90. 129° 40' 360.70 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 91. 137° 56' 517.89 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); -19- 92. 53° 12' 68.88 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 93. 340° 40' 371.98 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 94. 324° 43' 445.11 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462); 95. 347° 40' 70.51 feet along Lot B of Waikoloa Beach Resort—King's Course Resubdivision No. 2 (File Plan 2462) and Lot A of Waikoloa Beach Resort —RM-6 Subdivision (File Plan 2457); 96. 31' 50' 366.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 97. 80° 30' 90.00 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 98. 131° 50' 95.77 feet along Lot A of Waikoloa Beach Resort—RM-6 Subdivision (File Plan 2457); 99. 52° 20' 229.00 feet; 100. 322° 20' 25.00 feet; 101. 51' 57' 1,349.39 feet to the point of beginning and containing an area of 95.191 Acres. All as shown on the map attached hereto, marked Exhibit"A" and by reference -20- made a part hereof. SECTION 2. In accordance with Section 25-2-44, Hawaii County Code 1983 (2016 Edition, as amended), the County Council finds the following conditions are: (1) Necessary to prevent circumstances which may be adverse to the public health, safety and welfare; or (2) Reasonably conceived to fulfill needs directly emanating from the land use proposed with respect to: (A) Protection of the public from the potentially deleterious effects of the proposed use, or (B) Fulfillment of the need for public service demands created by the proposed use. INSERT CONDITIONS SECTION 3. Severability. If any provision of this ordinance, or the application thereof to any person or circumstance, is held invalid, the invalidity does not affect other provisions or applications of the ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this ordinance are severable. -21- SECTION 4. This ordinance shall take effect upon its approval. INTRODUCED BY: COUNCIL MEMBER, COUNTY OF HAWAII Hawaii Date of Introduction: Date of 1 st Reading: Date of 2nd Reading: Effective Date: -22- CKumuHouPDREZ.crk.11.8.21 WAIKOLOA LAND COMPANY CHANGE OF ZONE APPLICATION (PL-REZ-2021-000005) CONDITIONS OF APPROVAL A. The applicant(s),its successor(s), or assign(s) (Applicant) shall be responsible for complying with all of the stated conditions of approval. B. The Applicant shall comply with all conditions of the State Land Use Decision and Order(Docket No. A89-637) or any amendments thereto and the concurrent SMA Use Permit. C. This project area shall be called the Kumu Hou Project District. D. The Kumu Hou Project District shall consist of not more than 133.822 acres of land for multiple-family residential, commercial uses, community uses, golf support facilities, support service facilities, open space and recreational areas, pedestrian pathways and bikeways, and ancillary related improvements. E. The maximum number of multiple-family residential timeshare units allowed shall be 900 units. Any increase in the number of units shall require an amendment to the Kumu Hou Project District Ordinance. F. A minimum of 20.8 acres (including 17.8 acres of renaturalized lava) throughout the Kumu Hou Project District, shall be set aside for open space and recreational uses, which includes a minimum of three (3) acres of improved areas including parks, trails, and the like, as represented in the Applicant's conceptual plans. As represented by the Applicant, construction of the proposed gateway parks and public access pathways shall be completed no later than issuance of the first occupancy permit for the first multiple-family residential structure. G. The following permitted uses are to be allowed in the Kumu Hou Project District within the 133.822-acre development area: 1. Amusement and recreation facilities, indoor. 2. Art galleries,museums. 3. Automobile service stations. 4. Bars. 5. Business services. 6. Churches, temples, and synagogues. -1- 7. Day care centers. 8. Convenience stores. 9. Community buildings. 10. Display for products sold elsewhere. 11. Dwellings, single-family. 12. Dwellings, double-family or duplex. 13. Dwellings, multiple-family. 14. Farmers Market. 15. Financial institutions. 16. Golf courses and related golf course uses, including golf driving ranges, golf maintenance buildings and golf club houses. 17. Home Occupations as permitted within Section 25-4-13 of the Zoning Code. 18. Major outdoor amusement and recreation facilities. 19. Medical clinics. 20. Meeting facilities. 21. Model homes. 22. Neighborhood parks,playgrounds, tennis courts, swimming pools, and similar neighborhood recreational areas and uses. 23. Offices. 24. Personal services. 25. Photography studios. 26. Public and private utility uses and structures. 27. Real estate sales offices. 28. Restaurants. 29. Retail establishments. 30. Schools. 31. Security gates and security stations. 32. Spa and Fitness clubs. 33. Telecommunication antennas and towers as permitted under Section 25-4-12 of the Zoning Code. -2- 34. Theaters. 35. Time share units, including units with fractional ownership and short term vacation rental units. 36. Utility substations, wastewater treatment plants, landscaping, and plant nurseries, and vehicle maintenance service yards. 37. Visitor information center. 38. Any uses similar in nature to the above permitted uses shall be permitted upon submittal of a request by the Applicant and approved by the Planning Director. 39. Buildings and uses normally considered directly accessory to the uses permitted in this section shall also be permitted. H. The following design standards shall apply: 1. Landscaping for the development shall comply with the Zoning Code and Planning Department's Rule No. 17, Landscaping Requirements, and the overall landscaping plan for the Waikoloa Beach Resort, as amended. 2. The height limit for structures within the project shall not exceed the following: a. Multiple-Family Residential Development: forty-five (45) feet. b. Commercial, community use facilities, operation support facilities, and golf course support facilities: forty (30) feet. 3. The minimum building site area in the Kumu Hou Project District shall be fifteen thousand square feet. 4. The minimum yards (setback) shall be as follows: a. Multiple-Family Residential Development: (1) Front and rear yards: twenty feet; and (2) Side yards: eight feet for a one-story building,plus an additional two feet for each additional story. b. Commercial Development, Community Uses, Golf Support Facilities and Support Service Facilities: (1) Front and rear yards: fifteen feet; and -3- (2) Side yards: none, except where the side yard adjoins the side yard of a building site used for purposes allowed in RS or RM zones, the yard setback appropriate for the RS or RM district shall be used. 5. The minimum off-street parking and loading space requirements for the Kumu Hou Project District will comply with the minimum standards as required by the Zoning Code, including compliance with the American Disabilities Act(ADA) requirements. L All project utilities shall be underground. J. The Applicant shall secure necessary potable water from the Waikoloa Water System through the execution of an extension agreement and payment of a Contribution in Aid of Construction fee and meeting with the standards of the appropriate governmental agencies prior to issuance of a building permit for any use in the Kumu Hou Project District. K. All residential, commercial, community use facilities, golf course support facilities and timeshare operations facilities shall connect to the Waikoloa Beach Resort Wastewater Treatment Plant, meeting with the approval of the appropriate governmental agencies. As represented by the Applicant, all development related wastewater shall be treated to an R-1 (tertiary)water quality standard and shall be used for irrigation of landscaping or other beneficial reuse to the maximum extent feasible. L. The interior roadway requirements for the Kumu Hou Project District may be designed to resort standards as allowed by the Subdivision Code. M. The Applicant shall disclose to all potential buyers of lots or units within the proposed project that internal infrastructure and community facilities shall be developed and maintained privately and that the County is not obligated to construct any public facilities within the project area. N. An updated Traffic Impact Assessment Report(TIAR) shall be submitted to the Planning Department for review and approval prior to issuance of Site Plan Approval for the 400th multiple-family residential unit within the Kumu Hou Project District. The TIAR shall include prior consultation with the State -4- Department of Transportation, which shall so be noted in the TIAR. Upon receipt of the TIAR, the Planning Department shall submit it to the State Department of Transportation and the County Department of Public Works for a maximum 90- day review and comment period. Within 150 days of receipt of the TIAR, the Planning Department shall complete its review, comment, and decision regarding acceptance of the TIAR. The TIAR shall recommend any appropriate traffic mitigation measures; provided, however,that any suggested off-site traffic mitigation measures shall be based on an implementable pro-rata approach, with appropriate credits being given for existing,prior, or future off-site infrastructure improvements. In the event the mitigation requires pro-rata contributions, and the State Department of Transportation is unable to provide a legally acceptable and equitable pro-rata program within 180 days of acceptance of the TIAR,to avoid double assessment and assure the timely processing of construction permits, payment of the fair share funds to support road and traffic improvements, as required under Condition Y of this ordinance, shall be deemed to have satisfied by this requirement. O. All development-generated runoff shall be disposed of on-site and shall not be directed toward any adjacent properties. A drainage study shall be prepared by a licensed civil engineer and submitted to the Department of Public Works for review and approval prior to issuance of Site Plan Approval for any phase of the project. Any recommended drainage improvements, if required, shall be constructed meeting with the approval of the Department of Public Works prior to receipt of a Certificate of Occupancy for any structure. P. All earthwork activity, including grading and grubbing, shall conform to Chapter 10, Erosion and Sedimentation Control, of the Hawaii County Code. Q. A National Pollutant Discharge Elimination System (NPDES)permit and an Underground Injection Control (UIC)permit, if required, shall be secured from the State Department of Health before the commencement of construction activities. -5- R. The Applicant shall comply with the State Department of Health's regulations and rules related to, but not limited to, Underground Injection Systems, Air Pollution, Food Establishment Sanitation, Water Quality, and Community Noise. S. A Solid Waste Management Plan shall be prepared and submitted to the Department of Environmental Management for review and approval prior to the issuance of Site Plan Approval for any phase of the development. T. Approval of an archaeological inventory survey of the Kumu Hou Project District area shall be secured from the Department of Land and Natural Resources - State Historic Preservation Division (DLNR-SHPD) prior to issuance of Site Plan Approval for any phase of the development. U. Approval of an archaeological preservation plan addressing the preservation of Sites 26871 and 26873 and portions of Site 31230 as well as maintenance agreements and updated preservation treatments along a portion of the Ala Loa (Forerunner) trail in proximity to"Area A" of the Kumu Hou at Waikoloa project or as otherwise may be required by an approved AIS, shall be secured from the Department of Land and Natural Resources - State Historic Preservation Division (DLNR-SHPD) prior to issuance of Site Plan Approval for any phase of the development. Approved buffer areas shall be depicted on any site plans for Site Plan Approval, subdivision approval, or other land alteration permits. Interim preservation measures shall be in place prior to the initiation of any construction or land disturbance activity in the project area. V. In the event that surface or subsurface historic resources, including human skeletal remains, structural remains (e.g., rock walls, terraces, platforms, etc.), cultural deposits, marine shell concentrations, sand deposits, or sink holes are identified during the demolition and/or construction work,the Applicant shall cease work in the immediate vicinity of the find, protect the find from additional disturbance and contact the State Historic Preservation Division at(808) 933- 7651. Subsequent work shall proceed upon an archaeological clearance from DLNR-SHPD when it finds that sufficient mitigation measures have been taken. W. Pursuant to Hawaii County Code, Section 25-2-46(o) (Concurrency Requirements) the Applicant shall provide a Civil Defense siren and associated -6- maintenance access easements within the project area as required by the State Civil Defense prior to issuance of Certificate of Occupancy for any structure within the Kumu Hou Project District project area. X. The subject property is identified as a Formerly Used Defense Site (FUDS) by the U.S. Army Corps of Engineers, who will manage the investigation, clean-up and long-term monitoring on lands formerly used as an artillery firing range. For more information, please contact Honolulu District Public Affairs,US Army Corps of Engineers 808-835-4004/4002, hiip://www.12oh.usace.army.mil/Missions/Environmental/FUDS.aspx or www.poh.usace.army.mil. Y. The Applicant shall make its fair share contribution to mitigate the potential regional impacts of the development with respect to parks and recreation, fire, police, solid waste disposal facilities and roads. The fair share contribution shall become due and payable prior to receipt of Site Plan Approval for each project phase and shall be based on the actual number of additional residential units (inclusive of time share units) or lots created. The fair share contribution in a form of cash, land, facilities, or any combination thereof shall be determined by the County Council. The fair share contribution may be adjusted annually beginning three (3)years after the effective date of this ordinance, based on the percentage change in the Honolulu Consumer Price Index (HOPI). The fair share contribution shall have a combined value of$9,662.28 per multiple family residential unit or lot($15,057.57 per single family residential unit or lot). The total amount shall be determined with the actual number of residential lots according to the calculation and payment provisions set forth in this condition. The fair share contribution per multiple family residential unit or lot(single family residential unit or lot) shall be allocated as follows: 1. $4,766.13 per multiple family residential unit or lot($7,261.03 per single family residential unit or lot)to the County to support park and recreational improvements and facilities; 2. $150.63 per multiple family residential unit or lot($350.27 per single family residential unit or lot)to the County to support police facilities; -7- 3. $463.37 per multiple family residential unit or lot($691.83 per single family residential unit or lot)to the County to support fire facilities; 4. $206.52 per multiple family residential unit or lot($302.89 per single family residential unit or lot)to the County to support solid waste facilities; and 5. $4,075.63 per multiple family residential unit or lot($6,451.55 per single family residential unit or lot)to the County to support road and traffic improvements. In lieu of paying the fair share contribution, the Applicant may contribute land and/or construct improvements/facilities related to parks and recreation, fire, police, solid waste disposal facilities and roads within the region impacted by the proposed development, subject to the review and recommendation of the Planning Director, upon consultation with the appropriate agencies and approval of the County Council. Z. Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for imposition of exactions or the assessment of impact fees, conditions included herein shall be credited towards the requirements of the Unified Impact Fees Ordinance. AA. Comply with all other applicable County, State and Federal laws, rules, regulations, and requirements. BB. An annual progress report shall be submitted to the Planning Director prior to the anniversary date of the approval of this Project District Ordinance. The report shall include, but not be limited to, the status of the development and the extent to which the conditions of approval are being satisfied. This condition shall remain in effect until all of the conditions of approval have been satisfied and the Planning Director acknowledges that further reports are not required. CC. Should any of the conditions not be met or substantially complied with the Planning Director may initiate rezoning of the subject area to its original or more appropriate designation. -8- OPEN AREA 2 M- �� A-5a PEN OPEN RM-6 VILLAGE-COMMERCIAL(CV-10) M-8 TO AREA 6 PROJECT DISTRICT(PD) 4.505 ACRES PEN TO A-5a PROJECT DISTRICT(PD) OPEN RM-3 4 / 93.191 ACRES OPEN AREA 1 i OPEN MULTIPLE-FAMILY RESIDENTIAL(RM-6) RM-8 RM-6 7,819.70'N TO 29,422.45'W PROJECT DISTRICT(PD) RM-6 "PUU HINAI" 12.027 ACRES OPEN RM-6 7,232.42'N 32,849.12'W Puu HINAI" OPEN RM-3 K ° OPEN OPEN RM-4 OPEN �o�a�ara0 RM-1.5 OPEN A-5a EN 4.859 43'N 33,907.85'W "PUU HINAI" OPEN AREA 4 �y1Qy OPEN(0) RM-4 j�G TO PROJECT DISTRICT(PD) 4,838.74'N �J 0.144ACRES 1-yq� 33,353'W ,rJ KOC "PUU HINAI" AREA 3 CV-10 OPEN AcNpR oJ��� MULTIPLE-RESIDENTIAL(RM-0) A-5a TO PE PROJECT DISTRICT(PD) 21.720 ACRES 4,308.92'N 33,786.00'W "PUUHINAI" OPEN AREAS MULTIPLE-FAMILY RESIDENTIAL(RM-4) TO RM-6 PROJECT DISTRICT(PD) A-5a �0�(-0 0.235 ACRES OPEN A-5a Feet 0 1,000 2,000 3,000 4,000 5,000 6,000 AMENDMENT TO TIDE ZONING CODE AMENDING SECTION 25-8-9 (PUAKO-ANAEHOOMALU ZONE MAP)ARTICLE 8, CHAPTER 25 (ZONING) OF THE HAWAI'I COUNTY CODE 1983 (2016 EDITION, AS AMENDED), BY CHANGING THE DISTRICT CLASSIFICATION FROM OPEN (0), MULTIPLE-FAMILY RESIDENTIAL (RM-4), MULTIPLE-FAMILY RESIDENTIAL (RM-6), MULTIPLE-FAMILY RESIDENTIAL (RM-8) and VILLAGE-COMMERCIAL (CV-10) TO PROJECT DISTRICT (PD) AT WAIKOLOA, SOUTH KOHALA, HAWAII TMK:(3)6-9-008:por.13,22, MAP PREPARED BY: 25,por.29 and 33 COUNTY OF HAWAII, PLANNING DEPARTMENT DATE:July 27,2021 EXHIBIT"A" Waikoloa Land Co.-Area B Map: 1429