My WebLink
|
Help
|
About
|
Sign Out
Home
Continuous Lanai Portal Frame Drawing Samples_arrangement 34x22
PublicDocuments
>
Public Works
>
Building Division
>
Bulletins
>
Continuous Lanai Portal Frame Drawing Samples_arrangement 34x22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2021 3:45:05 PM
Creation date
11/10/2021 2:52:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRACED WALL LINE LENGTH <br />BRACED WALL LINE LENGTH <br />BRACED WALL LINE LENGTH <br />BRACED WALL LINE LENGTH <br />16'-0" MAX <br />20'-0" MAX <br />32'-0" MAX <br />32'-0" MAX <br />OF PANEL <br />HEADER BEAM <br />1 <br />HEADER BEAM <br />2 <br />HEADER BEAM 1 HEADER BEAM 2 HEADER BEAM 3 <br />EQ <br />EQ <br />MEOW* <br />. . <br />MEOW* <br />. . <br />C — — C <br />07MEOW* <br />8'-0" MAX 8'—O" MAX <br />MEOW* <br />. . . . <br />. . . . <br />l <br />A <br />13 <br />mommo <br />A <br />� 09 <br />< <br />A <br />08 <br />l <br />rA <br />08 <br />l <br />A <br />11 <br />l <br />4%01 <br />q A <br />l 10 <br />134%0 <br />1 00000 4111111111111111 ma loommo <br />OR <br />A <br />12 <br />C <br />C <br />C <br />C <br />CD <br />CD <br />CD <br />CD <br />LJ <br />C <br />LJ <br />C <br />LJ <br />C <br />LJ <br />C <br />X <br />X <br />X <br />X <br />FOR A PANEL SPLICE (IF NEEDED), <br />o <br />PANEL EDGES SHALL BE BLOCKED, <br />o <br />0 <br />0 <br />:.. AND OCCUR WITHIN 24" OF <br />o <br />MID -HEIGHT. ONE ROW OF TYP. <br />o <br />SHEATHING -TO -FRAMING NAILING IS <br />REQUIRED. IF 2x4 BLOCKING IS <br />USED, THE 2x4's MUST BE NAILED <br />TOGETHER W/ 3 16D SINKERS <br />.. <br />:: <br />B <br />13 <br />B <br />09 <br />TR <br />B B <br />1310 <br />moll <br />12 <br />I*viiiiiiiiiiiii <br />I 41 <br />u <br />u <br />ii ii <br />ii ii <br />ii ii <br />u u <br />ii ii <br />a ii u u <br />L <br />L <br />lL L �1 <br />PRO,EC„,LE PRESCRIPTIVE SOLUTIONS UTILIZING <br />PR9,EC„"LE PRESCRIPTIVE SOLUTIONS UTILIZING <br />PR9,EC„"LE PRESCRIPTIVE SOLUTIONS UTILIZING <br />PR9,EC„"LE PRESCRIPTIVE SOLUTIONS UTILIZING <br />ALTERNATE BRACED WALL PANELS <br />ALTERNATE BRACED WALL PANELS <br />ALTERNATE <br />BRACED WALL <br />PANELS <br />ALTERNATE BRACED WALL PANELS <br />�— <br />- = = <br />- = = <br />- = = <br />1012021 <br />10/2021 <br />10/2021 <br />10/2021 <br />REV <br />DESCRIPTION <br />DATE <br />REV <br />DESCRIPTION <br />DATE <br />REV <br />DESCRIPTION <br />DATE <br />REV <br />DESCRIPTION <br />DATE <br />EET Tn�e <br />ARRANGEMENT <br />EET Tne <br />ARRANGEMENT 2 <br />EET Tn�e <br />ARRANGEMENT <br />EET Tn�e <br />ARRANGEMENT 4 <br />COUNTY OF HAWAI'I <br />DEPARTMENT OF PUBLIC WORKS <br />COUNTY OF HAWAI'I <br />DEPARTMENT OF PUBLIC WORKS <br />COUNTY OF HAWAI'I <br />DEPARTMENT OF PUBLIC WORKS <br />COUNTY OF HAWAI'I <br />DEPARTMENT OF PUBLIC WORKS04 <br />DESIGN BY: DHL <br />s"'"° <br />DESIGN BY: DHL <br />SHTNo <br />DESIGN BY: DHL SHTNo <br />DESIGN BY: DHL <br />SHTNo <br />DRAWN BY: NB <br />DRAWN BY: NB <br />DRAWN BY: NB <br />DRAWN BY: NB <br />BUILDING DIVISION <br />1 <br />1 <br />BUILDING DIVISION <br />BUILDING DIVISION <br />3 <br />BUILDING DIVISION <br />101 PAUAHI ST; SUITE 7 <br />101 PAUAHI ST; SUITE 7 <br />101 PAUAHI ST; SUITE 7 <br />101 PAUAHI ST; SUITE 7 <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />BRACED WALL LINE LENGTH <br />BRACED WALL LINE LENGTH <br />BRACED WALL LINE LENGTH <br />GENERAL NOTES <br />ARRANGEMENTS METHOD NOTES <br />00 <br />40-0" MAX <br />48'-0" MAX <br />64'-0" MAX <br />00 <br />THE FOLLOWING ALTERNATE BRACED WALL PANEL <br />ARRANGEMENTS ARE INTENDED FOR USE ALONG A <br />1. ABSOLUTELY NO SPLICING OF THE HEADER BEAM IS <br />ALLOWED OTHER THAN WHAT IS SHOWN IN THE <br />HEADER BEAM 1 HEADER BEAM 2 <br />HEADER BEAM 1 HEADER BEAM 2 HEADER BEAM 3 <br />HEADER BEAM 1 HEADER BEAM 2 <br />PATIO/GARAGE EXTERIOR WALL LINE. EACH ARRANGEMENT IS <br />ARRANGEMENTS. <br />ASSUMED TO BE USED ACROSS THE ENTIRE LENGTH OF THE <br />WALL LINE. THEREFORE, GIVEN A BRACED WALL LINE <br />2. ALL ARRANGEMENTS APPLY TO SINGLE -STORY, <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />LENGTH, THE APPROPRIATE ARRANGEMENT CAN BE SELECTED <br />SLAB -ON -GRADE STRUCTURES ONLY. <br />FROM THE SCHEDULE BELOW. <br />• <br />3. A HEADER IS SUPPORTED BY EITHER A "PANEL" OR A <br />° <br />C— —C <br />C— —C C— <br />—C <br />° <br />C = _ <br />�. .°. <br />° <br />"VERTICAL SUPPORT". ALL PANELS ARE A MINIMUM OF <br />16" WIDE,WHILEA VERTICAL SU IS A MINIMUM OF <br />6" OR 12” WIDE DEPENDING UPON WHETHER THE HEADER <br />l <br />A <br />A <br />l <br />l <br />A A <br />A <br />A <br />OCCURS ON ONE SIDE OR BOTH SIDES OF THE SUPPORT. <br />08 <br />10 <br />08 09 <br />4. IT IS ASSUMED FOR ALL ARRANGEMENTS EXCEPT <br />ARRANGEMENT 4) THAT THE HEADER SUPPORTS (i.e., <br />A <br />A <br />PANELS AND VERTICAL SUPPORTS) ARE EQUALLY SPACED <br />11 <br />11 <br />ARRANGEMENTS SCHEDULE <br />APART. <br />OR <br />5. THE RELEVANT DETAILS IN THIS PACKET SHALL BE <br />ARRANGEMENT # <br />BRACED WALL LINE LENGTH <br />CD <br />_ <br />CD <br />_ <br />CDOR <br />= <br />PHOTOCOPIED AND/OR INCORPORATED INTO FULL-SIZED <br />PLANS. MERELY ATTACHING 8-1/2" x 11„ <br />1 <br />2 <br />16' MAX <br />20' MAXRESIDENTIAL <br />20' MA <br />X <br />X <br />12 <br />X <br />12 <br />HARDCOPIES OF THESE DETAILS WILL NOT BE ACCEPTED. <br />< <br />Q <br />Q <br />3 <br />32' MAX <br />4 <br />32 MAX <br />0 <br />0 <br />17 <br />7 <br />0 <br />5 <br />40 MAX <br />6 <br />4 ' MAX <br />48' MAX <br />B <br />.. <br />7--------------- <br />-------------- <br />------------------------------------64----MAX -- <br />B B <br />B <br />B <br />B <br />08 09 <br />08 <br />OR <br />09 <br />to <br />111,_.. <br />�_ _ . <br />_.. <br />_.. <br />OR <br />B <br />Og <br />B <br />B <br />12 <br />12 <br />COUNTY OF HAWAIJ <br />DEPARTMENT OF PUBLIC WORKS, BUILDING DIVISIONPRESCRIPTIVE <br />�� <br />,� <br />,� <br />Ll <br />17, <br />SOLUTIONS UTILIZING <br />_ <br />r <br />_ _ � <br />_ r <br />_ r <br />_ r <br />` _ <br />r <br />ALTERNATE BRACED WALL PANELS <br />ALTERNATE ARRANGEMENT LAYOUTS <br />°JEI„"LE PRESCRIPTIVE SOLUTIONS UTILIZING <br />OJEIT71TLE PRESCRIPTIVE SOLUTIONS UTILIZING <br />OJEIT71TLE PRESCRIPTIVE SOLUTIONS UTILIZING <br />ALTERNATE BRACED WALL PANELS <br />ALTERNATE BRACED WALL PANELS <br />ALTERNATE <br />BRACED WALL <br />PANELS <br />DATE: 10/X}21 <br />DRAWN BY: NB <br />CHECKED BY: DHL <br />1012021 <br />=_____ <br />1012021=___ <br />= <br />1012021 <br />---- <br />----- <br />----- <br />SHEET NO. <br />REV <br />DESCRIPTION <br />DATE <br />REV <br />DESCRIPTION <br />DATE <br />REV <br />DESCRIPTION <br />DATE <br />SHEET RLE. <br />SHEET RLE. <br />EETTRLE. <br />DESIGN Bv: DHL <br />s"'"° <br />05 <br />DESIGN BY: DHL <br />s"'"° <br />06 <br />DESIGN BY: DHL SHTNo <br />O 7 <br />COUNTY OF HAWAII <br />DEPARTMENT OF PUBLIC WORKS <br />ARRANGEMENT 5 <br />COUNTY OF HAWAII <br />DEPARTMENT OF PUBLIC WORKS <br />ARRANGEMENT 6 <br />COUNTY OF HAWAII <br />DEPARTMENT OF PUBLIC WORKS <br />BUILDING DIVISION <br />DRAWN BY: NB <br />BUILDING DIVISION <br />DRAWN BY: NB <br />BUILDING DIVISION <br />ARRANGEMENT 7 <br />DRAWN BY: NB <br />101 PAUAHI ST; SUITE 7 <br />101 PAUAHI ST; SUITE 7 <br />101 PAUAHI ST; SUITE 7 <br />OF # SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />HILO, HI 96720 <br />CHECKED BYflHL <br />- OF - SHTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.