My WebLink
|
Help
|
About
|
Sign Out
Home
2021-10-27 EMC minutes draft
PublicDocuments
>
Environmental Management
>
Environmental Management Commission
>
Agendas
>
2020-2024
>
2021
>
2021-11-24
>
2021-10-27 EMC minutes draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 2:57:54 PM
Creation date
11/15/2021 2:57:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chair Adams said she hoped commissioners took the time to listen to the presentation that <br />Director Mansour and Deputy Wastewater Chief Eric Takamura gave to the RAWEEM <br />Committee. It basically lays out the woeful status of why our wastewateris in need of so much <br />money. It’s part of the challenge that we as a Commission face, about how we can come up <br />with solutions. <br /> <br />Chair Adams encouraged the Commission to look through presentation slides, and also if you <br />can manage it, listen to where the Council members are coming from and what the key issues <br />are. They are funding, personnel issues, and compliance with the array of EPA actions against us <br />that are driving the need for DEM resources. <br /> <br />Commissioner Fulton said she had not personally visited the Hilo Wastewater Treatment Plant <br />but what was presented in that report was pretty stunning. Looking at the slides, it says that 86 <br />percent of assets at the Hilo Wastewater Treatment Plant are condition 5, failed, or 4, rehab <br />required. There are some stunning photos attached. It’s an effective and dramatic presentation <br />that was made about the state of decay of the Hilo Wastewater Treatment Plant. That does <br />raise questions about how effectively that plant is functioning, and we are getting into <br />regulatory areas here. So the question is, is the Hilo WWTP consistently able to meet secondary <br />standards? <br /> <br />Chief Beck said yes, the plant is currently meeting permit requirements. There is a lot of <br />deterioration and lack of redundancy, and we have had projects on the CIP list for years and <br />years to try and address these issues. But as each year goes by there is a lack of funds or a lack <br />of staffing. We need both, basically. For both areas it has just been depressing. But to answer <br />the question, we are meeting discharge limits. <br /> <br />Commissioner Fulton offered her sympathy for the position that all the good folks at DEM find <br />themselves in, from the top down to the bottom. She has friends who have people working <br />over at the Hilo WWTP and hears how guys are being sent all over the island, and the County <br />government has deferred maintenance on our wastewater treatment system for decades, and <br />now it’s catching up to us, and we are coming to a point of crisis. But it’s not the fault of people <br />working at in wastewater. It’s the lack of funding due to that Division. And at this point we have <br />to do anything we can to get more funding going to DEM. <br /> <br />Chair Adams asked about the WIFIA money that was approved to buy generators. She was <br />asking why generators were the No. 1 priority for the money. <br /> <br />Chief Beck said that when she talked to Deputy Director Brenda Iokepa-Moses, she said it had <br />to be for a specific use. Chief Beck said she inquired as to whether the money could be used for <br />some of the repairs that are needed. She didn’t know too much about that. The Deputy <br />Director may have more information on that. <br />8 <br /> Link to slides presented to Council’s RAWEEM Committee: <br />http://records.hawaiicounty.gov/weblink/DocView.aspx?dbid=1&id=112837 <br />16 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.