My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-12-16 Leeward
>
Item #08 West Hawaii Business Park LLC (Amend REZ 1049)
>
PD RECOMMENDATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 7:04:58 PM
Creation date
12/7/2021 7:04:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and parking stalls associated with the proposed development. Landscaping shall also be <br /> indicated on the plans for the purpose of mitigating any adverse noise or visual impacts to <br /> adjacent properties in accordance with the requirements of the Landscaping Master Plan <br /> approved by the Planning Department on December 1, 2009,and/or any approved <br /> amendments thereto. <br /> F. The [ pplieantstieeesser-s or- ]Applicant shall implement landscaping <br /> improvements as required by the Landscaping Master Plan approved by the Planning <br /> Department on December 1, 2009,and/or any approved amendments thereto. The <br /> required landscaping improvements shall be installed in conjunction with the <br /> development of immediate surrounding areas. <br /> G. An updated Traffic Impact Analysis Report (TIAR) certified by a licensed engineer shall <br /> be submitted for review and approval by the Planning Director in consultation with the <br /> Department of Public Works and the State Department of Transportation, if warranted by <br /> a significant change in circumstances or as may be required by the Department of Public <br /> Works during the design and review of construction plans for future road segments. The <br /> improvements identified in the updated TIAR shall be provided in an appropriate design <br /> year or phased in with the needed right-of-way provided. Mitigation measures called for <br /> in the revised TIAR that are reasonably related to project impacts shall be implemented in <br /> a manner that meets with the approval of the Planning Director in consultation with the <br /> Department of Public Works and the State Department of Transportation. <br /> H. Access to Parcel 1 from Queen Ka`ahumanu Highway shall be limited to the North <br /> Access Road and the South Access Road signalized intersection under such terms and <br /> conditions required by the Department of Transportation. <br /> L The [ pplie, tstieeesser-s or- ]Applicant shall implement the approved overall <br /> Roadway Circulation Plan submitted as Figure 2 with the November 2017 TIAR showing <br /> the major road corridors within the project area. Driveways within the North and South <br /> Access Roads between Queen Ka`ahumanu Highway and Kanalani Street shall meet with <br /> the approval of the Department of Public Works in consultation with the State <br /> Department of Transportation. <br /> J. Prior to the issuance of a Certificate of Occupancy of any structure within the project <br /> area, except as provided in Conditions K, L, [ ] M, N, and O,below, Kamanu Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.