My WebLink
|
Help
|
About
|
Sign Out
Home
PD RECOMMENDATION REPORT
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-12-16 Leeward
>
Item #08 West Hawaii Business Park LLC (Amend REZ 1049)
>
PD RECOMMENDATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 7:04:58 PM
Creation date
12/7/2021 7:04:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additionally, new Condition N will require the applicant to extend Kamanu Street <br /> from its existing pavement within TMK: 7-4-020:013 (please note, the applicant <br /> inadvertently identified this as TMK 7-4-020:024, thus the Director is recommending to <br /> amend the condition correcting this)to the southern boundary of Parcel 78 to County <br /> dedicabee standards (which include the provision of curb, gutter, and sidewalks as <br /> required by DPW in the approved Kamanu Street Extension construction plans) and <br /> construct an internal driveway with a minimum 20-foot pavement width, meeting with <br /> approval of the Department of Public Works. According to the applicant, this driveway <br /> will provide an internal connection between Kanalani Street and Kamanu Street that will <br /> be open and accessible to the public during normal business hours of the proposed single <br /> use on the property, thus providing an alternate route between Hina Lani Street and <br /> Kealakehe Parkway. <br /> County water is available to the project site and required water system <br /> improvements for the Phase 1 project area are subject to various Well Site and Off-Site <br /> Improvement Agreements between the applicant and the Department and Board of Water <br /> Supply. Maintenance of water commitments remain a condition of approval. <br /> According to the State Department of Transportation, the proposed amendments <br /> and roadway improvements are consistent with the approved Roadway Circulation Plan <br /> meeting with the requirements of Condition I of the subject ordinance and would have no <br /> significant, direct impacts to State highways, thus no additional traffic studies are <br /> required to support the proposed amendments. <br /> There are currently no County sewer lines serving the project site, however, <br /> conditions of the State Land Use Boundary Amendment(SLUBA)Docket No. A00-730 <br /> articulate requirements and limitations on enhanced individual wastewater systems in the <br /> near term and require projects in the petition area to be developed with dry sewer lines to <br /> eventually connect to the Kealakehe Wastewater Treatment Plan (WWTP)when a <br /> connection is available. The applicant has and will continue to comply with these <br /> conditions. To assist with the eventual connection of the project to the WWTP, the <br /> applicant has dedicated Parcel 90 to the County for the construction of a regional sewer <br /> pump station. <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.