My WebLink
|
Help
|
About
|
Sign Out
Home
Applicant Response Letter to Leeward Commission dated 12-1-21
PublicDocuments
>
Planning Department
>
Leeward/Windward Planning Commission
>
Board Packets
>
*Background/Recommendation Reports (June 2020-Sept 2022)
>
2021
>
2021-12-16 Leeward
>
Item #01 Waikoloa Land Company (PL-SMA-2021-000001)
>
Applicant Response Letter to Leeward Commission dated 12-1-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 1:32:23 PM
Creation date
12/13/2021 1:32:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Michael Vitousek, Chair <br /> December 1, 2021 <br /> Page 3 <br /> b. This area and region will continue to be service 1 by its stations in Waimea and <br /> North Kona. The issue is not infrastructure but staffing. In that regard, Kumu <br /> Hou will generate considerable revenue via the .eal property tax and Transient <br /> Accommodation Tax (TAT) or what has been tcelmically referred to as Time <br /> Share Occupancy (TSO)tax. These revenues v ill stay with the County and <br /> should thus enable the funding of more public s ifety personnel. (It was reported <br /> in the applications that upon build out, the real )roperty tax revenues alone—and <br /> not including TAT and/or TSO taxes for the eni ire resort—would generate <br /> approximately $14 million annually in 2020 do lars.) <br /> 3. Timing of Workforce Housing. The Commission e mphasized the need to have a <br /> timetable for the availability of the workforce hous ng. In discussing this with the <br /> potential developer, the Applicant is agreeable to a condition that would assure its <br /> opening no sooner than the issuance of any timesh,re occupancy permit. This should <br /> help incentivize its completion. <br /> The Applicant would like to suggest that the follov ing condition be made a part of <br /> the Project District Ordinance (PL-REZ-2021-000( 05): <br /> "As represented by the Applicant, the Applicant sh 711 cause the development of a <br /> workforce housing project on a property identified by TMK: 6-9-008:032 in <br /> accordance with mutually agreeable terms betwee)! the Applicant and the County <br /> Office of Housing and Community Development. i he terms shall be established in a <br /> workforce housing agreement and shall include the Applicant's infrastructure <br /> construction and land conveyance obligations and operational considerations such as <br /> tenant income and other eligibility criteria. An occupancy permit for the first <br /> workforce housing unit shall be obtained no later i han issuance of an occupancy <br /> permit for any time share unit within the area cow red by this ordinance. " <br /> 4. Estimated Construction Timetable <br /> During the course of the hearing,the Commission wanted to have information <br /> regarding the project's construction timetable. In t hat regard, we would like to share <br /> the following. <br /> Area A, which is covered by SMA 2021-000002 a id REZ 2021-000004, is designed <br /> to accommodate the relocation of Hilton Grand V,cation's (HGV) planned 264 <br /> existing entitled and zoned multiple-family resider tial units from portions of the area <br /> designated for the proposed 900 multiple-family rf sidential units within the Project <br /> District area. The latter area is covered by SMA 2021-000004 and REZ 2021-000005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.