indicated in brown. Single-Family dwelling would be in this shaded area, as well as this <br />particular color yellow. The green shaded area is zoned Open. The applicant is requesting a <br />Special Management Area Use Permit to allow the demolition as well as the reconstruction of <br />the Mauna Kea Beach Hotel golf courseclubhouse facility. Also requested is a Use Permit to <br />allow the reconstruction of the golf course clubhouse. And the reason why a use permit is <br />required is that the property is zoned Resort and Open and the Zoning Code requires that a Use <br />Permit be granted by the Planning Commission before a golf course or golf-course related <br />facilities can be allowed within these two zoned districts.The existing, I’m just going to skip <br />over some of these. Okay, and I’ll go to this particular map. And although it’s listed as a <br />proposed parking plan, and all of you have a copy of this particular map, the proposed clubhouse <br />facility would be generally where it’s currently situated. The existing clubhouse is <br />approximately 20,000 square feet in size and the reconstructed or new clubhouse would be <br />situated in the same location but would be increased slightly by 2,000 square feet for a total of <br />approximately 22,000 square feet in size. Now as part of the, the structure would include a golf <br />shop, locker rooms, the golf cart storage area, golf administration area and a restaurant. There <br />are currently 60 parking stalls provided in this general configuration.The green shaded stalls are <br />those areas that are set aside for the golf course users. And the blue shaded stalls are those, 30 <br />stalls that are provided for users of the beach; these are basically public access parking stalls. <br />Ten of these stalls were required as part of the settlement agreement between Mauna Kea <br />Properties and Akau et al. back in I believe the eighties, early eighties, or late seventies. And 20 <br />additional stalls, these blue stalls, were provided voluntarily by the applicant. The cost of the <br />proposed improvements would be approximately 6.5 million dollars and construction will be <br />completed in late 2008. <br />The Planning Director is recommending approval of both permits and with the normal standard <br />construction conditions, as well as a Condition 3. However, the Director would also like to at <br />this time amend the initial Condition 3 to state as follows: “Ten additional parking stalls shall be <br />provided for public access to the shoreline for a total of 40. The additional stalls do not have to <br />be located in the vicinity of the golf clubhouse but may be located in the vicinity of the Mauna <br />Kea Beach Hotel or other sites providing equivalent shoreline access.” So these are the <br />conditions that are being proposed, I mean this is one of the conditions that is proposed by the, or <br />recommended for adoption by the Planning Director. Are there any questions? <br />WATANABE: Yes. How do we get to a total of 40 if 10 was originally required back in I <br />believe it was 79 and Mauna Kea Beach Hotel Corp. has indicated that they have on their own <br />accord provided a total of 20? How did we get 40? <br />HAYASHI: If I may explain, the initial settlement agreement required 10 parking <br />stalls. <br />WATANABE: Right. <br />HAYASHI: Okay. The Mauna Kea Properties voluntarily provided 20 additional <br />public access parking stalls for a total of 30. So now we are requiring that the applicant provide <br />10 additional on top of that 30. So that would total 40 public access stalls. <br />WATANABE: Thank you. Do we have any further questions of the staff? Okay. Let’s <br />see, do we have the representatives here for Mauna Kea Beach Hotel Corporation? <br />EXHIBIT B <br />2 <br /> <br />