Laserfiche WebLink
VITOUSEK: Well, I can hear you very faintly. <br /> KAWANO: Hello? <br /> DAVENPORT: John, maybe get off your speaker and just go on to regular phone yeah. <br /> VITOUSEK: If you're together, he could just sit where you're sitting. <br /> DAVENPORT: Oh, okay, John come, you can sit here. Okay, here,just put my headsets on. <br /> KAWANO: Good morning, everybody. <br /> VITOUSEK: Good morning. <br /> KAWANO: Sorry, there's something going on with my phone. My name is John Kawano, I've <br /> lived here next to the Metzler of property for 3 generations. I have 3 concerns with this property <br /> and like Ms. Davenport said number one (1) is the flood impact, number 2 is the effect on traffic <br /> and number 3 is how would this effect our future zoning for Ag? Would this open up a floodgate <br /> for other people to just go "hey, I have Ag-5 let's slice this and dice this. So, number 1, let's go <br /> with number 1. There is an AEF floodplain running down Mamalahoa Highway. This is the <br /> overflow from Lanimaumau Stream. It starts at the Fukuki property, TMK: 6-4-024:016. It <br /> egresses onto Mamalahoa Highway, runs down Mamalahoa Highway like Ms. Davenport said. <br /> My question is, I want to go on record to request a FEMA impact this property will have on the <br /> other properties below the Metzler property. Because I've seen it rain here and I've seen just the <br /> egress right now it's encroached on HPM. It's flooded HPM, it's flooded NAPA, it's flooded <br /> Ululani Plaza. So, that's my real concern is public safety on this thing. How is it going to <br /> impact the rest of the establishments below this project? The floodplain runs past Metzler's <br /> property. Are you going to require him to put in sidewalks? If so, are you going to require him <br /> to put in drainage to control this flow? And it's going to go 2 ways the floodwater will either <br /> egress this property or it'll run from his property and add to the flooding downstream. <br /> So, I'm saying a FEMA impact study will be probably in the County's best interest and Mr. <br /> Metzler's best interest for liability in the future. And then number 2 if you require Mr. Metzler <br /> to put in sidewalks here so, we go into the sidewalk issue. When they did the Waimea <br /> improvement with the sidewalks in town there came the American Disability Act. They had to <br /> narrow the egress between each opening of the sidewalk. So, ACE Hardware, HPM, Ululani <br /> Plaza when cars coming out the other car coming in has no room to come over the sidewalk. <br /> They have to climb the sidewalk. So, if you have this Metzler project with these sidewalks <br /> traffic is going to stop. It will stop traffic and it's going to be a problem. So that's my second <br /> issue is the traffic. How would this affect the traffic? And then, my third issue is how it'll affect <br /> zoning? Will this project affect Ag-5's where people going hey Metzler did it, we can cut up our <br /> Ag-5 into 2 10,000 square foot lots? So, those are my 3 issues on this project, thank you for your <br /> time. I hope they get addressed and that's about it, thank you very much. <br /> VITOUSEK: Okay, thank you so much for your testimony. <br /> 3 <br /> EXHIBIT A <br />